Slack more.()

题目

Slack more.()

  • A、多松点儿。
  • B、少松点儿。
  • C、多紧点儿。
  • D、少紧点儿。
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Once the logic of a network is laid out, the project manager will conduct a forward pass and backward pass through the network. This will provide information on the _____ and identification of the _____ .

A.Slack for each activity, critical path.

B.Slack for each activity, high risk activities.

C.Manpower shortages, high risk activities.

D.High risk activities, non-critical paths.

E.Manpower availability, contingency plans.


正确答案:A

A

第2题:

67 As a project is carried out and slack time is consumed on individual tasks, the slack left over for the remaining tasks is:

A. Insignificant.

B. Reduced.

C. Unchanged.

D. Increased.

E. Doubled


正确答案:C

第3题:

The critical path is calculated by

A.subtracting the end date of task one from the start date of task two.

B.determining which tasks have the least amount of total slack.

C.totaling the time for all activities.

D.determining the shortest path through the network.

E.Determining which tasks have the most slack


正确答案:B
B

第4题:

下列哪项关于活动最晚开始时间的计算是正确的()。

A、EF–Dur(持续时间)

B、ES-Dur

C、LF-Dur

D、ES–Slack(松弛时间)

E、LF-Slack


参考答案:C

第5题:

● The critical path is calculated by

A subtracting the end date of task one from the start date of task two.

B determining which tasks have the least amount of total slack.

C totaling the time for all activities.

D determining the shortest path through the network.

E Determining which tasks have the most slack


正确答案:B

第6题:

The basic terminology for networks includes:

A.Activities, events, manpower, skill levels and slack.

B.Activities, documentation, events, manpower and skill levels.

C.Slack, activities, events, and time estimates.

D.Time estimates, slack, sponsorship involvement, and activities.

E.Time estimates, slack time, report writing, life cycle phases, and crashing times.


正确答案:C
C

第7题:

Laura forgot ________ the money and asked her father for more.

(A) receive

(B) received

(C) to receive

(D) receiving


正确答案:D
解答参考:forget/remember to do sth.“忘记/记得要做……”,forget/remember doing sth.“忘记/记得已做过……”。【译文】劳拉忘记了已收到钱,又向她爸爸要。

第8题:

As a project is carried out and slack time is consumed on individual tasks, the slack left over for the remaining tasks is:

A.Insignificant.

B.Reduced.

C.Unchanged.

D.Increased.

E.Doubled.


正确答案:C
C

第9题:

● As a project is carried out and slack time is consumed on individual tasks, the slack left over for the remaining tasks is:

A Insignificant.

B Reduced.

C Unchanged.

D Increased.

E Doubled.


正确答案:C

第10题:

The hero boy grows up to a man and he can not hear the sound of the bell any more.()


参考答案:错误