A project requires&en

题目

A project requires a new server to be set up with the ability to automatically fail over its Ethernet connection to a second connection if a network failure occurs. Which of the following provides greatest resiliency?()

  • A、Two switch ports will be needed on a switch, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, and one IP address will be needed.
  • B、Two switch ports will be needed on two different switches, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, and one IP address will be needed.
  • C、Two switch ports will be needed on two different switches, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, two different IP addresses will be needed.
  • D、One switch port will be needed on one switch, a splitter will be needed to split the connection, two ethernet cables will be needed for the server each connecting to two different Ethernet cards, and two different IP addresses will be needed.
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

The project life-cycle can be described as:

A.project concept, project planning, project execution, and project close-out.

B.project planning, work authorization, and project reporting.

C.project planning, project control, project definition, WBS development, and project termination.

D.project concept, project execution, and project reporting.

E.All of the above.


正确答案:A
A

第2题:

167 The project life-cycle can be described as:

A. project concept, project planning, project execution, and project close-out.

B. project planning, work authorization, and project reporting.

C. project planning, project control, project definition, WBS development, and project termination. D. project concept, project execution, and project reporting.

E. All of the above


正确答案:A

第3题:

The project charter is a document designed to tell _____ exactly what the project entails.

AThe project manager

BThe project office

CThe project team

DThe project sponsor

EAnyone associated with the project


正确答案:E

 

第4题:

● The scope baseline/project charter is prepared by the:

A Project manager

B Project manager and project office

C Project manager, project office and functional team

D Project manager, project office, functional team and project sponsor

E Project manager, project sponsor and customer/user


正确答案:E

第5题:

139 The project charter is a document designed to tell _____ exactly what the project entails.

A. The project manager

B. The project office

C. The project team

D. The project sponsor

E. Anyone associated with the project


正确答案:E

第6题:

The quality objectives are approved in the conceptual stage of the project by the:

A . Project Engineer

B . Project Manager

C . Functional Manager

D . Quality Assurance Manager

E . Project Owner


正确答案:E

第7题:

123 The scope baseline/project charter is prepared by the:

A. Project manager

B. Project manager and project office

C. Project manager, project office and functional team

D. Project manager, project office, functional team and project sponsor

E. Project manager, project sponsor and customer/user


正确答案:E

第8题:

The scope baseline/project charter is prepared by the:

AProject manager

BProject manager and project office

CProject manager, project office and functional team

DProject manager, project office, functional team and project sponsor

EProject manager, project sponsor and customer/user


正确答案:E
E

第9题:

● Interfacing with the customer after project go-ahead is the responsibility of:

A Project sponsor

B Project team

C Project manager

D Functional manager

E All of the above are possible, based upon the size and complexity of the project


正确答案:C

第10题:

● (74) is primarily concerned with defining and controlling what is and is not included in the project.

(74)

A. Project Time Management

B. Project Cost Management

C. Project Scope management

D. Project Communications Management


正确答案:C

更多相关问题