Shut down all client partitions before updating the VIO server.
Disconnect the client partitions from any IP networks before updating the VIO server.
Update the client partitions to the latest OS maintenance level before updating the VIO Server.
Update the VIO server while the partitions are running, but reboot each client partition at a convenient time after the update.
第1题:
A. Each process has its own protected memory space
B. Each process is started manually by the user at boot
C. Aall processes are dependent on each other
D. Multiple processes allow each routing protocol to be independent
第2题:
The systems administrator of a large manufacturer has POWER5 and POWER6 servers, each with LPARs running AIX 6.1. They are running several workloads including SAP, DNS, Oracle, DB2 and WebSphere Application Server, and plan to consolidate onto one POWER7 server. How can the system administrator determine how much benefit Active Memory Expansion (AME) could provide for the consolidated system?()
第3题:
A.1
B.2
C.3
D.4
第4题:
ompany.com has a Micro-Partitioned p5-570 4-way with six application partitions and two VIO servers. Each VIO server has been allocated 0.5 CPU and the application servers have been allocated 0.4 CPUs. The marketing department wants to deploy a new Web server to support the release of a product. The systems architect has recommended that the Web server will require a whole CPU. Which of the following should the technical specialist suggest to provide the most cost-effective deployment?()
第5题:
What is an advantage of multiple software process running in the Junos OS?()
第6题:
A financial customer has three data centers that are approximately five kilometers apart. Their SAP application data needs to be kept synchronized within 10 milliseconds between the three sites.Which of the following solutions satisfies the customer‘s recovery time objective?()
A. DS8700 systems at each site running Metro Mirror
B. DS5300 systems at each site running Metro Mirror
C. DS5100 systems at each site running Global Mirror
D. XIV systems at each site running synchronous mirroring
第7题:
An enterprise has a web application running both HTTP and HTTPS. How many Clusters must becreated?()
第8题:
A. Each process has its own protected memory space.
B. Each process is started manually by the user at boot.
C. All processes are dependent on each other.
D. Multiple processes allow each routing protocol to be independent.
第9题:
Company.com has an application that has a hard-coded hostname in the startup routines. The application is being made highly available using HACMP. During testing, the application does not start on the standby node because the hostname was not what the application expected. What can be done to fix this problem?()
第10题:
Company.com has a database application and a Web server application running on the same p5-570 server in a single partition. Recently there have been a number of instances where the increased load on the database server has impacted the performance of the Web server. What can the technical specialist recommend to keep the database application from impacting the performance of the Web server?()