Order a new HMC to support the p5 system.
Attach the new p5 system to the existing HMC.
Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.
Do nothing. This system does not require an HMC.
第1题:
A customer has a mixed environment of AIX on POWER4 and POWER5, and x86 based systems running a supported distribution of Linux. There is a total of 7 partitions and three standalone x86 servers. The customer wants to consolidate their applications using a single 4-core POWER6 server. What is the minimum PowerVM edition that supports the customer requirement?()
第2题:
What IBM resource helps to easily identify a business application that has been validated on IBM Systems?() NOTE:// Solutions that are in this resource represent applications that enable IBM Systems and verify, through customer experience, installing and running in a customer location.
第3题:
A financial customer has three data centers that are approximately five kilometers apart. Their SAP application data needs to be kept synchronized within 10 milliseconds between the three sites.Which of the following solutions satisfies the customer‘s recovery time objective?()
A. DS8700 systems at each site running Metro Mirror
B. DS5300 systems at each site running Metro Mirror
C. DS5100 systems at each site running Global Mirror
D. XIV systems at each site running synchronous mirroring
第4题:
A customer wants to run VMWare ESX on an x445 with a large number of virtual machines running Windows 2003 Server as a Disaster Recovery (DR) Site for the production environment. Which of the following questions would most impact the memory configuration?()
第5题:
A customer wants to expand their current storage environment, but has floor space for only two machine frames or two racks. Their environment consists of IBM SAN Volume Controllers and IBM DS4000 systems. The DS4000 systems are at end of lease. The customer wants the maximum number of disks possible in two frames. Which of the following solutions is best for this customer?()
第6题:
A customer has ordered a rack, a p650, two p630s, and two p615s. During a conversation on installation planning, the pSeries technical specialist recognizes that the customer expects the rack to arrive as one unit. However, the specialist knows that the p650 will be racked, but the other systems will arrive separately. In fact, the other systems are CSU (Customer Set Up). Why should the specialist immediately inform the customer that additional racking is the customer’s responsibility?()
第7题:
A prospective customer has a SCSI installed. The new project requires a large high performance storage and tape network . The customer does not appear to understand the terminology and options of the fiber channel components of the solution. Further discussion confirms that the customers only has cursory knowledge of fiber channel and is not currently prepared to for the installation. What steps should be taken to make sure customer is satisfied with the solution? ()
第8题:
A customer has many RS/6000s and POWER4 systems running different AIX applications. What should the customer do to best position themselves for the migration to POWER5?()
第9题:
A customer needs to deploy ten dual processor Xeon servers. Six servers will be running Linux and Apache, and the other four will be Citrix presentation servers. The customer’s main concerns are the rack space and the option to have SATA drives. The maximum memory required is 8GB. Which of the following options will provide the best price and performance?()
第10题:
A customer has two DS8000 systems in their environment. One DS8000 has FlashCopy licensed while the other does not. The customer wishes to license FlashCopy on the second DS8000. Which of the following describes the TDA requirement in this situation()