A customer is installing an HMC-managed Power 720 with two p

题目
单选题
A customer is installing an HMC-managed Power 720 with two partitions, one for Production the other for Testing. They plan to use the Testing partition only occasionally and want to minimize hardware. Which of the following meets these requirements?()
A

Create a system profile for each partition. Assign all needed resources as 'required'.

B

Define all system resources as 'desired' on the Testing partition. Activate only as needed.

C

Create two shared processor pools. Assign the minimal I/O resources required for each partition to the shared pools.

D

Create both partitions with minimal 'required' resources, and optional resources as 'desired'. Activate each partition as necessary.

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A customer has a p650 on order and plans to put it in a current OEM rack.  They are concerned that the p650 power supply may demand more current than the OEM PDU can provide.  Which planning guide specification would provide the necessary requirements?()

  • A、Voltage
  • B、Frequency
  • C、Power Source Loading (max)
  • D、Power Source Loading (typical)

正确答案:C

第2题:

Which feature of the IBM p5 servers enables customers to be confident that data within two distinct partitions on the server will be isolated?()

  • A、POWER Hypervisor
  • B、Virtual LAN
  • C、POWER5 processor
  • D、Redundant Power and Cooling

正确答案:A

第3题:

A customer has provided the pSeries technical specialist with details of an HACMP solution that they would like validated.  The solution is for two POWER4+ p630 servers directly attached to a FAStT600 storage server as the shared storage.  Each system has the following: ? 2 integrated network ports ?   2 fibre channel adapter cards   ? 1 power supply and redundant cooling   ? HACMP v5.1   In addition to a second power supply, what further requirements, if any, are needed to validate this solution and ensure no single point of failure? ()

  • A、One fibre channel switch
  • B、Two fibre channel switches
  • C、Two Ethernet cards
  • D、Nothing

正确答案:B

第4题:

有关IBM Power 720服务器,下面的哪些说法是合理的()

  • A、Power 720可以使用Power6处理器
  • B、Power 720是IBM System p 服务器一款超低端产品,可配置4核、6核、8核CPU
  • C、Power 720采用power7芯片,支持3.3GHz,3.55GHz主频
  • D、Power 720支持AIX,LINUX,Windows操作系统

正确答案:D

第5题:

A p5 570 customer is currently running AIX 5.3. The customer now wants to add Virtual Ethernet to two of the LPARs. This will enable the application tier can communicate to the database tier without using an external Ethernet card. What is the best way to accomplish this task?()

  • A、Create a VIO server
  • B、Modify the LPAR profiles to add a Virtual Ethernet adapter
  • C、Buy the Advanced Power Virtualization feature and enter a authorization code at the HMC
  • D、Buy the Advanced Power Virtualization feature and enter a authorization code at the service  processor menu

正确答案:B

第6题:

A customer needs a solution that provides a total of eight processors (four active and four inactive), 16GB of memory, Advanced POWER Virtualization, and the ability to grow.  Which of the followingsystems should the pSeries technical specialist propose?()

  • A、p650
  • B、p5-570
  • C、Two p630s
  • D、p5-570 Express

正确答案:B

第7题:

A customer is very concerned about maintaining a competitive advantage through the use of state-of-the-art technology.  Assuming all solutions meet the customer’s technical requirements, which solution should the IBM team propose to maximize customer satisfaction?()

  • A、p690 with Dynamic LPAR
  • B、Grid of SP switch-attached p5-550s
  • C、p690 with Advanced POWER Virtualization
  • D、p5-570 with Advanced POWER Virtualization

正确答案:D

第8题:

A customer has ordered a rack, a p650, two p630s, and two p615s.  During a conversation on installation planning, the pSeries technical specialist recognizes that the customer expects the rack to arrive as one unit.  However, the specialist knows that the p650 will be racked, but the other systems will arrive separately.  In fact, the other systems are CSU (Customer Set Up). Why should the specialist immediately inform the customer that additional racking is the customer’s responsibility?()

  • A、Because additional systems would require more power receptacles
  • B、Because the customer may need to do additional facilities planning
  • C、Because the customer needs additional funding to cover the services
  • D、Because postponing the eventual discussion will likely lead to customer dissatisfaction

正确答案:D

第9题:

A customer is planning to buy a two enclosure Power 770, and will implement 4 LPARs with the following requirements:Each LPAR must have a private, dedicated connection to the network.The adapter for this network connection must be hot-swappable.The customer wants to minimize the number of I/O slots used. Which of the following fulfills the customer requirements?()

  • A、Two dual-port PCIe adapters
  • B、A four-port PCIe Ethernet adapter
  • C、Four separate PCIe Ethernet adapters
  • D、Two embedded Integrated Virtual Ethernet adapters (IVE)

正确答案:C

第10题:

A customer has a requirement for a single AIX LPAR to be highly available. The customer only has enough funding to purchase a single system. Which would be the most critical option to mitigate AIX availability?()

  • A、Dual power supplies.
  • B、Twice the amount of disk.
  • C、Two dual-port LHEA adapters.
  • D、Two dual-port fibre channel adapters.

正确答案:A

更多相关问题