Begin with a dual DP x445 and scale in the same chassis
Begin with a dual MP x445 and scale in the same chassis
Begin with a dual DP x445 and scale out in an extra chassis
Begin with a dual MP x365 and scale to a different machine
第1题:
A customer would like to create a shared processor partition with 16 virtual processors. What is the minimum number of processing units required in the partition profile?()
第2题:
A customer has a requirement for a server to run Windows Server 2003 Enterprise Edition and Exchange 2003 Enterprise Edition. It has been determined that 4GB RAM will be needed. The customer is trying to decide between the two following configurations: (1)An IBM xSeries x366 with 4 Xeon MP processors and 4 x 1GB memory DIMMs. (2)An IBM xSeries x445 with 4 Xeon MP processors and 8 x 1GB memory DIMMs. Which question should be asked to guide the customer in selecting the correct memory configuration?()
第3题:
When a project manager is running over the budgeted costs, the project manager can typically _____ to attempt to get the project back on budget.
A . Reduce features and/or functionality
B . Increase risk.
C . Incur a schedule slippage (to obtain more favorable pricing due to lengthened delivery times)
D . All of the above.
E . A and B only
第4题:
In addition to better overall price performance, which other factor most significantly contributes to a lower three-year TCO advantage for a pSeries customer than for a SUN customer?()
第5题:
When determining a customer’s security requirements using the security site survey from the steps for success methodology, which three of theses should be included in the customer’s security policy and procedures?()
第6题:
Companycom is converting an application over to a p5 595 server with LPARs and has underestimated the processor requirements. The system has COD processors, but the customer does not know how to size the workload. What course of action would help identify the processor requirement?()
第7题:
Which IBM resource should be used to validate the results from a Disk Magic study PRIOR topresenting the final storage solution and pricing to a customer?()
第8题:
The purpose of a collection letter is to ( ).
A. persuade a customer to buy a product
B. give a discount to a potential customer
C. ask a customer to pay a past-due bill
第9题:
A customer is considering an Intel processor-based blade solution from a competitor. The customer is willing to share only the information that the competitor offers 96 Xeon processors per rack. Which of the following IBM BladeCenter E benefits should the Sales Specialist emphasize first?()
第10题:
A commercial customer will soon send out a Request For Pricing (RFP) for a new large database server. Why would a pSeries technical specialist try to influence the customer to base the requirements on performance (TPC-C, Ideas International Relativity, Oracle Applications Standard Benchmark, etc.) rather than on numbers of processors?()