单选题
A customer has two Power 770 systems with 4 enclosures each.  Thirty two cores and 1TB of memory are activated on each system.  Each system has 3 database partitions and each partition has 10 cores and 300GB of memory.   Which solution will provide automated recovery of unplanned outages at least cost?()
A

Purchase PowerVM Enterprise Edition.Use System Director to automate Live Partition Mobility to recover from partition failure

B

Create additional shared processor partitions as standby nodes.Use PowerHA SystemMirror to activate and use CoD resources when a failover occurs

C

Purchase an additional 32-core Power 750 with PowerHA SystemMirror Standard Edition.Use the new system as standby node with the XD component of PowerHA

D

Purchase an additional Power 770 system.Locate production and standby database partitions on each system.Use DB2 pureScale to provide automated partition monitoring and failover

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A customer has provided the pSeries technical specialist with details of an HACMP solution that they would like validated.  The solution is for two POWER4+ p630 servers directly attached to a FAStT600 storage server as the shared storage.  Each system has the following: ? 2 integrated network ports ?   2 fibre channel adapter cards   ? 1 power supply and redundant cooling   ? HACMP v5.1   In addition to a second power supply, what further requirements, if any, are needed to validate this solution and ensure no single point of failure? ()

  • A、One fibre channel switch
  • B、Two fibre channel switches
  • C、Two Ethernet cards
  • D、Nothing

正确答案:B

第2题:

A customer is planning to buy a two enclosure Power 770, and will implement 4 LPARs with the following requirements:Each LPAR must have a private, dedicated connection to the network.The adapter for this network connection must be hot-swappable.The customer wants to minimize the number of I/O slots used. Which of the following fulfills the customer requirements?()

  • A、Two dual-port PCIe adapters
  • B、A four-port PCIe Ethernet adapter
  • C、Four separate PCIe Ethernet adapters
  • D、Two embedded Integrated Virtual Ethernet adapters (IVE)

正确答案:C

第3题:

A customer has many RS/6000s and POWER4 systems running different AIX applications.  What should the customer do to best position themselves for the migration to POWER5?()

  • A、Upgrade OS to AIX 5.2.
  • B、Implement Micro-Partitioning.
  • C、Upgrade HMC to support POWER5.
  • D、Install Partition Load Manager.

正确答案:A

第4题:

A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()

  • A、PCIe adapters
  • B、PCI-X adapters
  • C、PCI-X andPCIe adapters
  • D、PCI, PCI-X andPCIe adapters

正确答案:A

第5题:

A customer has a large UNIX environment and has engaged a pSeries technical specialist to work on a solution with them.  Which of the following statements would best establish UNIX credibility with a knowledgeable customer?()

  • A、The technical support specialist has completed a UNIX course at college.
  • B、The technical specialist has supported several similar projects and has earned an IBM AIX certification.
  • C、The technical support specialist’s company sells $3M of UNIX computer systems every year.
  • D、The technical support specialist has sold and installed at least a dozen Apple and iSeries systems with POWER processors.

正确答案:B

第6题:

A customer has ordered a rack, a p650, two p630s, and two p615s.  During a conversation on installation planning, the pSeries technical specialist recognizes that the customer expects the rack to arrive as one unit.  However, the specialist knows that the p650 will be racked, but the other systems will arrive separately.  In fact, the other systems are CSU (Customer Set Up). Why should the specialist immediately inform the customer that additional racking is the customer’s responsibility?()

  • A、Because additional systems would require more power receptacles
  • B、Because the customer may need to do additional facilities planning
  • C、Because the customer needs additional funding to cover the services
  • D、Because postponing the eventual discussion will likely lead to customer dissatisfaction

正确答案:D

第7题:

A customer wants to expand their current storage environment, but has floor space for only two machine frames or two racks. Their environment consists of IBM SAN Volume Controllers and IBM DS4000 systems. The DS4000 systems are at end of lease. The customer wants the maximum number of disks possible in two frames. Which of the following solutions is best for this customer?()

  • A、add one SVC
  • B、install one DS8700
  • C、install one DS8800
  • D、install one XIV system

正确答案:C

第8题:

A customer has a mixed environment of AIX on POWER4 and POWER5, and x86 based systems running a supported distribution of Linux. There is a total of 7 partitions and three standalone x86 servers. The customer wants to consolidate their applications using a single 4-core POWER6 server.  What is the minimum PowerVM edition that supports the customer requirement?()

  • A、 PowerVM Lx86
  • B、 PowerVM Express Edition
  • C、 PowerVM Standard Edition
  • D、 PowerVM Enterprise Edition

正确答案:C

第9题:

A customer has a requirement for a single AIX LPAR to be highly available. The customer only has enough funding to purchase a single system. Which would be the most critical option to mitigate AIX availability?()

  • A、Dual power supplies.
  • B、Twice the amount of disk.
  • C、Two dual-port LHEA adapters.
  • D、Two dual-port fibre channel adapters.

正确答案:A

第10题:

A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()

  • A、All the machines can be connected to the existing HMC, as long as it is updated to code level 7.7.1 or later
  • B、The Power 770 requires an HMC (7042-CR5 or later), so they must buy one. All of the systems can be managed by this new HMC
  • C、They should buy a new HMC for the Power 770 system, and leave the POWER5 and POWER6 based  systems connected to the existing one
  • D、The Power 770 requires an HMC, so they should connect the Power 770 to the HMC and convert the POWER5 and POWER6 based servers to IVM

正确答案:A