The control of distress traffic is the responsibility of().

题目
单选题
The control of distress traffic is the responsibility of().
A

the owners

B

the charterers

C

the shipper

D

the vessel in distress or of the station that relays the distress message

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

他们配合警察, 协管周围道路的车辆和行人

A.They will assist the police to supervise the traffic and passengers as well

B.They will help the police to control the traffic and pedestrians as well.

C.They will cooperate with the police in checking the traffic and pedestrians as well.

D.They will obey the police to control the traffic and pedestrians as well.


正确答案:B

第2题:

The Perform. Integrated Change Control process is conducted from project lnception through completion and is the ultimate responsibility of the(75)

A.change control board

B. project management office

C.project manager

D.configuration management officer


正确答案:C
本题目翻译:实施整体变更控制过程是从项目开始到完成进行,是项目经理的摄终责任。考察的是整体变更管理。

第3题:

In the project environment, the individual ultimately responsible for quality control is:

A . The line workers who must strive "to do things right the first time" to avoid quality problems.

B . the company's quality control manager who must work with the project members to ensure the quality control program is effective.

C . The head of the production department who retains ultimate quality control responsibility for all the company's projects.

D . The project manager who has ultimate responsibility for the entire project.

E . the customer who must ensure that he is receiving a quality product from the vendor.


正确答案:D

第4题:

The Perform Integrated Change Control process is conducted from project inception through completion and is the ultimate responsibility of the ( ) .

A.Chang control board
B.Project management office
C.Project manager
D.Configuration management officer

答案:C
解析:
实施整体变更控制过程是从项目开始到项目结束并且是项目经理的最终责任。

第5题:

______ is not likely to be a methods of Traffic Separation.

A.Separation of opposing streams of traffic by separation zones or lines

B.The separation of through traffic from local traffic by provision of inshore traffic zones

C.Division of traffic from several different direction into sectors

D.Control of routing traffic through shipping routes


正确答案:D

第6题:

Packet filtering firewalls identify and control traffic by examining the (),(),and ().

A、ways

B、source

C、destination

D、port


正确答案:B,C,D

第7题:

SDCCH全拼是()

A.Traffic Channel

B.Broadcast Control Channel

C.Stand-Alone Dedicated Control Channel

D.Access Granted Channel


参考答案:C

第8题:

41 In the project environment, the individual ultimately responsible for quality control is:

A. The line workers who must strive "to do things right the first time" to avoid quality problems. B. the company's quality control manager who must work with the project members to ensure the quality control program is effective.

C. The head of the production department who retains ultimate quality control responsibility for all the company's projects.

D. The project manager who has ultimate responsibility for the entire project.

E.the customer who must ensure that he is receiving a quality product from the vendor


正确答案:D

第9题:

What is meant by the term“radio silence”________.

A.Stations not directly involved with the on-going distress communications may not transmit on the distress frequency or channel

B.Stations remaining off the air to safeguard proprietary information

C.Two three-minute silent periods,at 15 and 45 minutes after the hour,that provide a transmitting“window”for distressed vessels to transmit distress alerts using J3E

D.Communications on a distress frequency or channel is banned for 24 hours following the cessation of the distress traffic


正确答案:A

第10题:

TCAS的英文全称为()。

  • A、Traffic alert and Collision Advoidance System
  • B、Traffic Collision and Alert System
  • C、Traffic Control and Service
  • D、Traffic Condition and Surveillance

正确答案:A

更多相关问题