Which option correctly identifies the four main menus of a C

题目
单选题
Which option correctly identifies the four main menus of a Cisco Wireless Control System (WCS)? ()
A

 Home, Configure, Location, and Monitor

B

 Home, Configure, Monitor, and Refresh

C

 Home, Monitor, Refresh, and Administration

D

 Monitor, Configure, Location, and Administration

E

 Monitor, Configure, Refresh, and Administration

F

 Monitor, Location, Refresh, and Administration

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Refer to the exhibit. This shows the NetFlow statistics for a router. You are analyzing the traffic pattern and you are interested in the percentage of packets between 32 and 64 bytes in size and the number of flows in progress. Which of these identifies both numbers correctly?()

A. 69.4%, 4061

B. 24.9%, 980

C. 69.4%, 35

D. 6.94%, 980

E. cannot be determined from this output


参考答案:C

第2题:

There are four questions,which is not from the discourse teaching?

A.What does the author imply?
B.Should we say“a apple”or“an apple”?
C.What can be inferred from the text?
D.What's the writer's main opinion?

答案:B
解析:
考查语篇教学

B选项,是关于冠词的正确用法,符合题意选择不正确选项,故此题的正确选项为B。

C和D选项都是和语篇相关的,故排除。

故此题的正确选项为B。

第3题:

What are four main components of a task?


参考答案:A task has four main components: 1) a purpose: making sure the students have a reason for undertaking the task. 2) a context: this can be real simulated or imaginary, and involves sociolinguistic issues such as the location.the participants and their relationship, the time, and other important factors.3) a process: getting the students to use learning strategies such as problem solving, reasoning, inquiringconceptualising and communicating.4) a product: there will be some of outcome, either visible (a written plan, a play, a letter, etc.) or invisible(enjoying a story, learning about another country, etc.).

第4题:

Option 10A (back-to-back VRF) is an implementation of inter-AS MPLS VPN. Which of four statementsabout option 10A are not true?()

  • A、MPLS is required between the ASBRs.
  • B、ASBR must hold all routing information.
  • C、It is a scalable solution.
  • D、It is a simple solution.
  • E、MP-EBGP is used to exchange routes between ASBRs.

正确答案:A,C,D,E

第5题:

Which set of classes correctly identifies the four traffic classes, from highest priority to lowest priority, specified in the 802.11e standard?()

  • A、 gold, silver, bronze, and platinum
  • B、 platinum, gold, silver, and bronze
  • C、 titanium, gold, silver, and bronze
  • D、 voice and video, best effort, background, and scavenger
  • E、 voice, video, best effort, and background
  • F、 voice, video, best effort, and scavenger

正确答案:E

第6题:

Which of these correctly identifies the six phases of the Cisco Lifecycle Services framework? ()

A. Prepare, Plan, Create, Implement, Operate, and Improve

B. Prepare, Plan, Design, Implement, Operate, and Optimize

C. Prepare, Plan, Design, Apply, Operate, and Manage

D. Prepare, Plan, Design, Implement, Operate and Manage


参考答案:B

第7题:

Have you got a table for four, Waiter?()

  • A、Welcome to our restaurant.
  • B、Yes, sure. This way, please.
  • C、We have booked the seats.
  • D、Here are the menus.

正确答案:B

第8题:

Which of the following procedures correctly lists the prerequisite software that requires installation with an AIX licensed program product?()

A.Use the lppdiff command to list the contents

B.Use the installp -Q command to list the contents

C.Choose the SMIT option to Preview Install Only

D.Choose the SMIT option to list dependents of a software product


参考答案:C

第9题:

Which option correctly identifies the four main menus of a Cisco Wireless Control System (WCS)? ()

  • A、 Home, Configure, Location, and Monitor
  • B、 Home, Configure, Monitor, and Refresh
  • C、 Home, Monitor, Refresh, and Administration
  • D、 Monitor, Configure, Location, and Administration
  • E、 Monitor, Configure, Refresh, and Administration
  • F、 Monitor, Location, Refresh, and Administration

正确答案:D

第10题:

Which of these correctly identifies the six phases of the Cisco Lifecycle Services framework? ()

  • A、Prepare, Plan, Create, Implement, Operate, and Improve
  • B、Prepare, Plan, Design, Implement, Operate, and Optimize
  • C、Prepare, Plan, Design, Apply, Operate, and Manage
  • D、Prepare, Plan, Design, Implement, Operate and Manage

正确答案:B

更多相关问题