A space-constrained customer is currently running AIX 5.2 on

题目
单选题
A space-constrained customer is currently running AIX 5.2 on a number of p650 servers and a pair of new p5-550 servers.  They have four identical new applications each requiring a minimum of seven processors and 96GB of memory.  Which solution would best meet the customer’s requirements?()
A

Two p670 servers

B

Four p650 servers

C

Two p5-570 servers

D

Four p5-550 servers

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A customer has many RS/6000s and POWER4 systems running different AIX applications.  What should the customer do to best position themselves for the migration to POWER5?()

  • A、Upgrade OS to AIX 5.2.
  • B、Implement Micro-Partitioning.
  • C、Upgrade HMC to support POWER5.
  • D、Install Partition Load Manager.

正确答案:A

第2题:

The /etc/qconfig file needs to be modified on a busy AIX print server with 30 printers attached.  What action should be performed before modifying this file()

  • A、lpstat; Record the currently running jobs
  • B、enq -D
  • C、enq -X
  • D、enq -h -p

正确答案:B

第3题:

InadditiontoaPOWER5systemandanHMC,whatelseisrequiredtoenableMicro-PartitionsinanAIXenvironment?()

A.AIX5.3andDynamicLogicalPartitioning

B.AIX5.2andDynamicLogicalPartitioning

C.AIX5.2andAdvancedPOWERVirtualizationfeature

D.AIX5.3andAdvancedPOWERVirtualizationfeature


参考答案:D

第4题:

A customer wants to take advantage of IBM’s Micro-Partitioning capabilities for their new AIX applications.   The pSeries technical specialist should recommend purchasing which of the following?()

  • A、p5 hardware, AIX 5.2, Virtual I/O Server
  • B、POWER4 hardware, AIX 5.3, Virtual I/O Server,
  • C、p5 hardware, AIX 5.3, Advanced POWER Virtualization feature
  • D、POWER4 hardware, AIX 5.2, Advanced POWER Virtualization feature

正确答案:C

第5题:

A p5 570 customer is currently running AIX 5.3. The customer now wants to add Virtual Ethernet to two of the LPARs. This will enable the application tier can communicate to the database tier without using an external Ethernet card. What is the best way to accomplish this task?()

  • A、Create a VIO server
  • B、Modify the LPAR profiles to add a Virtual Ethernet adapter
  • C、Buy the Advanced Power Virtualization feature and enter a authorization code at the HMC
  • D、Buy the Advanced Power Virtualization feature and enter a authorization code at the service  processor menu

正确答案:B

第6题:

A customer is running Microsoft Windows 2003, Sun Solaris, and IBM AIX with a total capacity of20 TB. This customer needs high availability for e-business applications. The servers are currently connected to two EMC Symmetrix subsystems that are running RAID 1. The customer wants to consolidate all storage into an IBM System Storage DS8700. How many Fibre Channel drive sets are needed to satisfy the total capacity for this customer?()

  • A、8 drive sets of 300 GB drives
  • B、4 drive sets of 300 GB drives
  • C、14 drive sets of 146 GB drives
  • D、18 drive sets of 146 GB drives

正确答案:D

第7题:

Companycom is migrating from p670 systems running AIX 5.2 to p5 595 systems running AIX 5.3. They will be changing out only the system units. They will re-use the existing 61D drawers and adapters with the new p5 595 systems. What compatibility issue must be considered?() 

  • A、APV features are not supported for some legacy POWER4 adapters
  • B、APV will require the most current maintenance level for AIX 5.2
  • C、APV features will require that legacy POWER4 adapters be updated with new microcode
  • D、The Virtual IO Server must run AIX 5.3 and the LPARs can run either AIX 5.2 or AIX 5.3

正确答案:A

第8题:

A customer is running Microsoft Windows 2003, Sun Solaris, and IBM AIX with a total capacity of20 TB. This customer needs high availability for e-business applications. The servers are currently connected to two EMC Symmetrix subsystems that are running RAID 1. The customer wants to consolidate all storage into an IBM System Storage DS8700.How many Fibre Channel drive sets are needed to satisfy the total capacity for this customer?()

A. 8 drive sets of 300 GB drives

B. 4 drive sets of 300 GB drives

C. 14 drive sets of 146 GB drives

D. 18 drive sets of 146 GB drives


参考答案:D

第9题:

A customer wishes to replace 12 older small UNIX systems.  They are running out of floor space in their data center and any solution must take this into consideration.  Assuming that the applications are supported on all AIX versions, which of the following would best meet the customer’s requirements?()

  • A、A p650 running AIX v5.3
  • B、A p5-550 running AIX v5.3
  • C、A p5-570 running Advanced POWER Virtualization
  • D、Multiple rack-mounted p615s running dynamic LPAR

正确答案:C

第10题:

Company.com has four pSeries servers in their data center and wants to deploy multiple Micro-Partitions.  Which of the following data center servers can be used for this purpose?()

  • A、p5-520 running Virtual I/O Server
  • B、p690 running AIX 5L V5.3
  • C、p5-510 running AIX 5L V5.2
  • D、p5-520 running two dedicated processor partitions

正确答案:A

更多相关问题