91 The Risk of NOT meeting project quality objectives:
A. can be minimized through continuous monitoring.
B. considered a long term risk.
C. will be reflected in the "in-service" life of the product or service.
D. B and C
E. All of the above
第1题:
3 Project tradeoffs are usually made by comparing _____ and constraints.
A. Time, cost, and quality
B. Time, risk, and quality
C. Risk, quality, and manpower availability
D. Cost, quality, and technical performance
E. Cost, quality, and risk
第2题:
85 Project tradeoffs are usually made by comparing _____ and constraints.
A. Time, cost, and quality
B. Time, risk, and quality
C. Risk, quality, and manpower availability
D. Cost, quality, and technical performance
E. Cost, quality, and risk
第3题:
Project trade-offs vary between
A . risk, cost and schedule.
B . direct cost, indirect cost, and resource availability
C . quality, schedule and time
D . cost, quality and schedule
E . contract terms, scope and budget
第4题:
YouaretestingacomponentthatserializestheMeetingclassinstancessothattheycanbesavedtothefilesystem.TheMeetingclasshasthefollowingdefinition:
Thecomponentcontainsaprocedurewiththefollowingcodesegment.
MeetingmyMeeting=newMeeting("Goals");
myMeeting.roomNumber=1100;
string[]attendees=newstring[2]{"John","Mary"};
myMeeting.invitees=attendees;
XmlSerializerxs=newXmlSerializer(typeof(Meeting));
StreamWriterwriter=newStreamWriter(@"C:\Meeting.xml");
xs.Serialize(writer,myMeeting);
writer.Close();
YouneedtoidentifytheXMLblockthatiswrittentotheC:\Meeting.xmlfileasaresultofrunningthisprocedure.WhichXMLblockrepresentsthecontentthatwillbewrittentotheC:\Meeting.xmlfile?()
第5题:
● Project tradeoffs are usually made by comparing _____ and constraints.
A Time, cost, and quality
B Time, risk, and quality
C Risk, quality, and manpower availability
D Cost, quality, and technical performance
E Cost, quality, and risk
第6题:
72 Project trade-offs vary between
A. risk, cost and schedule.
B. direct cost, indirect cost, and resource availability
C. quality, schedule and time
D. cost, quality and schedule
E. contract terms, scope and budget
第7题:
154 Project trade-offs vary between
A. risk, cost and schedule.
B. direct cost, indirect cost, and resource availability
C. quality, schedule and time
D. cost, quality and schedule
E. contract terms, scope and budget
第8题:
Project tradeoffs are usually made by comparing _____ and constraints.
ATime, cost, and quality
BTime, risk, and quality
CRisk, quality, and manpower availability
DCost, quality, and technical performance
ECost, quality, and risk
第9题:
您正在测试一个组件,该组件对Meeting 类实例进行序列化处理,以使它们能够保存到文件系统。Meeting具有如下定义:public class Meeting {private string title;public int roomNumber;public string[] invitees;public Interview(){}public Interview (string t){title = t;} }组件包含一个带有以下代码段的过程Meeting myMeeting = new Meeting("Objectives");myMeeting.roomNumber=20;string[] attendees = new string[2]{"Amy", "Ally"};myMeeting.invitees = attendees;XmlSerializer xs = new XmlSerializer(typeof(Meeting));StreamWriter writer = new StreamWriter(@"C:\Meeting.xml");xs.Serialize(writer, myMeeting);writer.Close();/您需要确定作为运行此过程的结果写入C:\Meeting.xml 文件的XML 块。哪个XML 块代表将写入C:\Meeting.xml 文件的内容?()