24 The project charter is prepared in which scope management process?
A. Initiation
B. Scope planning
C. Scope Definition
D. Scope change control
E. Scope verification
第1题:
Project(71)is an uncertain event or condition that,if it occurs,has a positive or a negative effect on at least one project objective,such as time,cost,scope,or quality.
A.risk
B.problem
C.result
D.data
第2题:
第3题:
● Project(71)is an uncertain event or condition that, if it occurs, has a positive or a negative effect on at least one project objective, such as time, cost, scope, or quality.
(71)
A.risk
B.problem
C.result
D.data
第4题:
在实际的工作计划制定过程中,主要采用三种方法:“基于项目(Project-based)”,“基于流程(Process-based)”和基于时间(Time-based)。
第5题:
第6题:
Project (75).Management:includes the processes required to ensure that the project includes au the word required, and only the work required, to complete the project successfully.
A.Integration
B.Configuration
C.Scope
D.Requirement
第7题:
第8题:
Project ______is an uncertain event or condition that,if it occurs,has a positive or a negative effect on at least one project objective,such as time,cost,scope,or quality.
A.risk
B.problem
C.result
D.data
第9题:
2、改变博弈的PARTS法中,S的含义是()
A.Strategy 博弈的策略
B.Scope 博弈的范围
C.State 博弈的状态
D.Sender 博弈有关信息的发布者
第10题:
改变博弈的PARTS法中,S的含义是()
A.Strategy 博弈的策略
B.Scope 博弈的范围
C.State 博弈的状态
D.Sender 博弈有关信息的发布者