单选题When should Solutions Assurance Reviews take place?()A Pre-order, pre-installationB Post-order, pre-installationC Pre-order, post completion sign-offD Pre-installation, post completion sign-off

题目
单选题
When should Solutions Assurance Reviews take place?()
A

Pre-order, pre-installation

B

Post-order, pre-installation

C

Pre-order, post completion sign-off

D

Pre-installation, post completion sign-off

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Something must be wrong with the post office—Sam didn’t _______ my package sent two months ago.

A.accept

B.receive

C.arrive

D.take


参考答案:B

第2题:

which activity belongs to post-listening activities? ()

A. Dictogloss

B. Predicting

C. Listen and take notes

D. Listen and tick


正确答案是:A

第3题:

The schedule risk is the _____ .

A the accumulated "expected' durations which maintain project completion.

B Critical Path adjusted by "high-risk" activity float.

C highest risk path that maintains quality.

D Critical Path when calculated with "most likely" duration.

E highest risk path that contributes the most risk toward the project completion.


正确答案:B

第4题:

Which of the following activities actually does not involve writing?

A.Completion according to outlines.
B.Completion with multiple choices.
C.Completion according to topic sentences.
D.Completion according to the brainstorming.

答案:B
解析:
考查写作技能教学。写作是一个从输入到输出的过程,因此要特别注意写前的输入。写作前进行的思路整理、素材组织、结构规划、大纲提炼、头脑风暴,写作中进行的遣词造句,以及写作后涉及的修改润色、检查校对都是写作活动中必不可少的环节。因此A、C、D三项都涉及写作,B项不涉及。
名师如何巧解题?查看视频解析>>

第5题:

which activity belongs to post-listening activities______.

A、Predicting

B、Listen and tick

C、Listen and take notes

D、Dictogloss


参考答案:D

第6题:

听力原文:M: Excuse me! I just need to send this letter the fastest way possible.

W: Let's see. We have overnight business service. That takes just two days.

Where does this conversation take place?

A.In a post office.

B.In a hotel.

C.In a bank

D.In a school.


正确答案:A
解析:男士是要send a letter(寄信),毫无疑问是在邮局。

第7题:

Would you tell me ________?

A、where is the post office

B、where stands the post office

C、where the post office is

D、where stood the post office


参考答案:C

第8题:

112 The schedule risk is the _____ .

A. the accumulated "expected' durations which maintain project completion.

B. Critical Path adjusted by "high-risk" activity float.

C. highest risk path that maintains quality.

D. Critical Path when calculated with "most likely" duration.

E. highest risk path that contributes the most risk toward the project completion


正确答案:B

第9题:

Upon the completion of required tests, a ____ should be placed on each extinguisher, showing the date and the person who completed the tests.

A.cap

B.disc

C.tag

D.cover


正确答案:C

第10题:

Based on which two conditions can master Preventive Maintenance (PM) schedules be created?()

  • A、 elapsed time since the target start date or completion date of previous work generated by PM  
  • B、 difference between completion date of previous work and system date is equal to Lead Time  
  • C、 elapsed time since the target start date or completion date of the latest work orders for the asset
  • D、 metered equipment usage since the target start date or completion date of previous work generated by PM
  • E、 metered equipment usage since the target start date or completion date of the latest work order for the asset

正确答案:A,D

更多相关问题