No upgrades are needed.
Add another 16-port RAN.
Add an 8-port async adapter.
Add an additional 128-port adapter.
第1题:
A customer has ordered a rack, a p650, two p630s, and two p615s. During a conversation on installation planning, the pSeries technical specialist recognizes that the customer expects the rack to arrive as one unit. However, the specialist knows that the p650 will be racked, but the other systems will arrive separately. In fact, the other systems are CSU (Customer Set Up). Why should the specialist immediately inform the customer that additional racking is the customer’s responsibility?()
第2题:
An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()
第3题:
An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC.Which infrastructure is required for the new HMC?()
A.An additional switch for the new HMC
B.Asynchronous adapters on the new HMC
C.The two 570 servers are directly connected to the new HMC
D.One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC
第4题:
A customer’s new rack contains 12 x p655 servers. The customer currently has an HMC with one 128-port async adapter with a rack mounted 16-port RAN. The HMC is already attached to two pSeries p630s. What upgrades, if any, are needed to the HMC to support the new p655 servers?()
第5题:
A customer is ordering a new p650 server to be placed into an existing OEM 42U 19-inch rack containing only two p630 servers. This is the first p650 in the enterprise. What is the most important question that the pSeries technical specialist should ask the customer before the order is placed?()
第6题:
A pSeries technical specialist is performing a solutions assurance with a customer for a new single-frame 10-node p655 system being attached to a currently installed HMC. Which of the following questions should be asked to gather all the required information to determine whether the p655 solution can connect to the HMC?()
第7题:
The customer intends to install a 7315-CR2 into a p690 frame. What should the pSeries technical specialist tell the customer?()
第8题:
An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()
第9题:
Companycom has several CR3 HMCs managing their p690 servers. They have purchased a new p5 570 and would like to manage the new system with an existing HMC. What is required to support this environment?()
第10题:
A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()