A customer is interested in purchasing a new IBM System Stor

题目
单选题
A customer is interested in purchasing a new IBM System Storage TS3500 Tape Library. Which ofthe following documents should be used first to guide the Business Partner to verify theenvironment?()
A

TS3500 Redbook

B

TS3500 Operators Manual

C

Solution Assurance Product Review (SAPR) Guide

D

TS3500 Product Installation and Planning Guide

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A customer has an EMC Symmetrix DMX3000 that is at the end of lease. The environment consists of IBM System p, IBM System i, and IBM System z. The customer is evaluating EMC,   HDS, and IBM storage as possible replacements. They are interested in comparing the performance of all three disk subsystems.  Which tool compares performance()

  • A、Capacity Magic
  • B、eConfig
  • C、TPC for Disk
  • D、Disk Magic

正确答案:D

第2题:

A customer wants to consolidate storage from four IBM System p servers and one large IBM System i server. The customer does not have a SAN installed. The customer will require approximately 4 TB for System p and 3 TB for System i. The customer states that performance and isolation of the System i system is most important. Capacity, multi-path access, and replication functions are important for the System p servers.    Which solution best satisfies the customer requirements()

  • A、IBM System Storage DS8100 with 300 GB drives for the System p, 73 GB/15k drives for System i, and advanced functions for System p capacity
  • B、IBM System Storage DS8300 with LPAR, 73 GB/15k drives for System i, and 300 GB drives and advanced functions for System p capacity
  • C、IBM System Storage DS6800 with direct attach, 73 GB/15k drives for System i performance, and 300 GB drives and advanced functions for System p
  • D、IBM System Storage DS6800 with LPAR, 146 GB/15k drives for System i, 500 GB FATA drives for System p

正确答案:B

第3题:

A customer is purchasing an IBM System Storage DS8700. What is the most important first step for the installation?()

A. verify configuration

B. conduct pre-install TDA

C. complete physical planning

D. verify the solution meets requirements


参考答案:B

第4题:

A customer is interested in purchasing a new IBM System Storage DS8000 solution to consolidateolder ESS and F20 storage systems. What should be done first, prior to final proposaldevelopment?()

  • A、perform a Disk Magic study 
  • B、review eConfig with a technical specialist 
  • C、confirm that the customer has enough ports available in the SAN infrastructure 
  • D、submit configuration to IBM System Storage Interoperability Center for validation

正确答案:A

第5题:

A major account is considering migrating from a proprietary Unix server to a Linux and Intel-based platform. They are not sure if the Intel-based server will be able to handle the workload of the Unix server.  What would be the best strategy to win with an IBM solution?()

  • A、Suggest to the customer to send their administrator to IBM System x training class to learn more about IBM Intel based servers.
  • B、Propose a try and buy option and offer to help the customer in sizing the new Linux server. Engage the system Engineer on this opportunity.
  • C、Introduce the IBM pSeries Unix product specialist to the account because IBM operating system (AIX) offers an open Unix solution.
  • D、Direct the customer to the IBM Web site to help with sizing and System x server models and types. Follow-up with the customer to answer any sizing question.

正确答案:B

第6题:

The customer is considering an IBM System Storage DS8000. Which of the following indicates a requirement for the Business Partner to perform a TDA?()

  • A、capacity above 500 TB
  • B、first in customer location
  • C、a new model has been released
  • D、sold without implementation service

正确答案:B

第7题:

A customer wants to consolidate storage from four IBM System p servers and one large IBM System i server on a high end disk subsystem. The customer does not have a SAN installed. The customer will require approximately 24 TB of capacity for System p and 20 TB of capacity for System i. The customer states that performance of the System i system is most important. Capacity, multi-path access, and replication functions are important for the System p servers.  Which solution best satisfies the customer requirements()

  • A、IBM DS8700 with 600 GB drives for the System p, 300 GB/15k drives for Systemi; and advanced functions for System p capacity
  • B、IBM DS8700 with LPAR, 300 GB/15k drives and RAID 10 for Systemi; and 600GB drives with RAID 5 and advanced functions for System p capacity
  • C、IBM DS8700 with advanced functions, 300 GB/15k drives and RAID 10 for Systemi performance; and 600 GB drives and RAID 5 for System p capacity
  • D、IBM DS5100 with Enhanced Remote Mirror, 600GB/15k drives and RAID 5 for System p; and 300GB/15k drives and RAID 10 for Systemi

正确答案:C

第8题:

The customer is considering an IBM System Storage DS8000. Which of the following indicates a requirement for the Business Partner to perform a TDA?()

A. capacity above 500 TB

B. first in customer location

C. a new model has been released

D. sold without implementation service


参考答案:B

第9题:

An IBM Business Partner suggests an IBM System Storage DS8000 to a customer with a SAN   that is now configured with an EMC Symmetrix subsystem disk.  The customer wants to determine if new HBAs and software upgrades are needed on the servers if the EMC storage is replaced by the DS8000 What document must be carefully read to help address the customer’s concerns()

  • A、IBM System Storage DS8000: Host Systems Attachment Guide
  • B、DS8000 Interoperability Matrix
  • C、IBM System Storage DS8000: Introduction and Planning Guide
  • D、IBM System Storage Solution Handbook

正确答案:B

第10题:

A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need to determine the current hardware configuration of the partitions before making any upgrade decisions. What is needed to read the exported system plan and design the new system?()

  • A、e-Config
  • B、System Planning Tool (SPT)
  • C、IBM Workload Estimator (WLE)
  • D、IBM Performance Monitor (PM)

正确答案:B