第1题:
A customer recently purchased an HS22 Blade to install into their existing BCH chassis. The customer installed the blade and it was not recognized. Which ofthe following is the first question for this customer?()
第2题:
A customer is planning to upgrade two VMware ESX servers from 3.5 to 4.1 after recently installing a new XIV Storage System. Each server has 4 HBAs connected to redundant fabrics for a total of 4 paths per server to storage. The customer wants to increase the throughput available to the ESX servers. What configuration setting does the storage specialist need to highlight?()
第3题:
A customer is concerned about rising power costs, and the limited space they have left in the computer room. They have been doing some research into virtualization and would like to know if they should pursue this solution. Which of the following architectural features should be discussed with them?()
第4题:
A customer is installing a new x3850 X5 server and has purchased a warranty upgrade on the server to 24 x 7 four hour response. The customer requested IBM help with setting up the RAID adapter. The customer was told IBM would not help them. Which of the following should be verified first?()
第5题:
Customer purchased and x3650 M3 server and requires the ability to remotely power on and off the server. What if any additional hardware would the customer need to purchase to remotely power the server on and off?()
第6题:
A recently ordered server came standard with one 3.0GHz processor. It is capable of handling fourtotal processors. Which of the following processor combinations can be used in this server?()
第7题:
Companycom has several CR3 HMCs managing their p690 servers. They have purchased a new p5 570 and would like to manage the new system with an existing HMC. What is required to support this environment?()
第8题:
A manufacturing customer has liminted space remaining in their data center and is concerned about rising power costs. The customer applications require very large amounts of memory. They want server redundancy and no downtime. Which of the following architectural features should be discussed with them?()
第9题:
A customer has a large HP Intel infrastructure and is actively managing these servers with Insight Manager. They recently purchased an IBM x346 server for a remote office database project. They do not want to run additional systems management software but require to be notified of PFA and hardware alerting on critical hardware components. Which of the following solutions would accomplish this?()
第10题:
Company.com is migrating from a third party managed disk subsystem to an IBM TotalStorage Enterprise Storage Server. Connection of the new storage server is complete, and it has been tested on all of the nodes in the three node HACMP cluster. How does the customer migrate to the new storage server with minimum down time?()