Effective systems management for all processor types that is

题目
单选题
Effective systems management for all processor types that is easy to implement and use is needed.  What processors are supported by the IBM BladeCenter?()
A

Intel/AMD/Power/Cell

B

Intel/Motorola/Zilog

C

Opteron/Dual Core/Quad Core

D

Celeron/Pentium/Xeon

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

● Scheduling systems such as PERT, ADM, and PDM are project management tools to be used by:

A The project manager and project office personnel.

B The project team and functional managers.

C The project sponsor.

D All of the above.

E A and B only.


正确答案:E

第2题:

Which of the following processor socket types would support an AMD processor?()

A.F

B.LGA

C.940

D.775

E.1155


参考答案:A, C

第3题:

Scheduling systems such as PERT, ADM, and PDM are project management tools to be used by:

A.The project manager and project office personnel.

B.The project team and functional managers.

C.The project sponsor.

D.All of the above.

E.A and B only.


正确答案:E
E

第4题:

What allows for a higher level of systems management capability that reduces the risk of changeas well as management and administrative costs?()

  • A、 policy control
  • B、 active participation
  • C、 systems-level approach
  • D、 application and service optimization

正确答案:A

第5题:

The purpose of the systems analysis phase is to build a logical model of the new system.The first step is(71),where you investigate business processes and document what the new system must do to satisfy users. This step continues the investigation that began during the(72). You use the fact-finding results to build business models,data and process models,and object models. The deliverable for the systems analysis phase is the(73),which describes management and user requirements,costs and benefits,and outlines alternative development strategies.The purpose of the systems design phase is to create a physical model that will satisfy all documented requirements for the system. During the systems design phase,you need to determine the(74),which programmers will use to transform the logical design into program modules and code. The deliverable for this phase is the(75),which is presented to management and users for review and approval.

A.systems planning phase
B.systems modeling phase
C.systems analysis phase
D.systems design phase

答案:A
解析:
翻译:系统分析阶段的目的是建立新系统的逻辑模型,第一步就是进行(71),调查业务流程并记录新系统必须做哪些以满足用户需求。这一步是(72)的延续,可以使用调查结果构建业务模型,数据和流程模型以及对象模型。系统分析阶段的可交付成果是(73),它描述了管理和用户要求,成本和收益,还有可替代的方案。系统设计阶段的目的是创建一个能够满足系统所有需求文件要求的物理模型。 在系统设计阶段,需要确定(74),程序员通过系统过程模型把逻辑设计转换为程序模块和代码。该阶段的可交付成果是(75),提交给管理层和用户审查和批准。(72) A.系统计划阶段B.系统建模阶段C.系统分析阶段 D.系统设计阶段
参考答案:(72)A

第6题:

Which of the following are standard AMD processor socket types?()

A.1366

B.1155

C.940

D.LGA

E.F


参考答案:C, E

第7题:

A project is a[temporary]( )of unique,complex,and connected activities having one goal or purpose and that must be completed by a specific time,within budget,and according to( ).Project management is the process of scoping,planning,staffing,organizing,directing,and controlling the development of a(n)( )system at a minimum cost within a specified time frame.For any systems development project,effective project management is necessary to ensure that the project meets the( ),is developed within an acceptable budget,and fulfills customer expectations and specifications,Project management is a process that starts at the beginning of a project,extends through a project,and doesn't culminate until the project is completed.The prerequisite for good project management is a well-defined system development process.Process management is an ongoing activity that documents,manages the use of,and improves an organization s chosen methodology(the“process”)for system development,Process management is concerned with the activities,deliverables,and quality standards to be applied to(请作答此空)project(s).

A.a single
B.a particular
C.some
D.all

答案:D
解析:
表示过程管理涉及应用于所有项目的活动。附(参考翻译):一个项目是一个独特的、复杂的、相互关联的活动的[临时]序列,有一个目标或目的,必须在特定的时间、预算内和根据规范完成。项目管理是一个范围界定、计划、人员配置、组织、指导和控制可接受系统开发的过程,在规定的时间内以最低的成本进行。对于任何系统开发项目,有效的项目管理都是必要的,以确保项目在截止日期前完成,在可接受的预算内开发,并满足客户的期望和规范,项目管理是从项目开始时开始的过程,延伸到一个项目中,直到项目完成才达到顶点。良好的项目管理的先决条件是定义良好的系统开发过程。过程管理是一项持续的活动,它记录、管理和改进组织为系统开发所选择的方法(“过程”),过程管理涉及应用于所有项目的活动、可交付成果和质量标准。

第8题:

● Project management provides organizations with a methodology to:

A Become more efficient and effective in accomplishing goals that cannot be handled well by the traditional structure

B Manage high risk repetitive work

C Provide clients with multiple points of contact

D Provide guidance in accomplishing repetitive activities

E All of the above


正确答案:A

第9题:

What are the two benefits of any intelligent network that uses a systems-level approach to integrate applications and services across an infrastructure?()

  • A、 reduce complexity
  • B、 reduced costs for all types of users
  • C、 packet inspection at wire speed
  • D、 QoS to the desktop
  • E、 LAN encryption services

正确答案:A,B

第10题:

Based on the following items, which two types of interfaces are found on all network-based IPS sensors?()

  • A、Loopback interface
  • B、Command and control interface
  • C、Monitoring interface
  • D、Management interface

正确答案:B,C