单选题A technical specialist has installed a Host Bus Adapter (HBA) on a p5-550 server. The system has four AIX 5L V5.3 partitions and a Virtual I/O server. The HBA will be used to connect all four partitions to a DS8000 storage array. What else must be perf

题目
单选题
A technical specialist has installed a Host Bus Adapter (HBA) on a p5-550 server. The system has four AIX 5L V5.3 partitions and a Virtual I/O server. The HBA will be used to connect all four partitions to a DS8000 storage array. What else must be performed to make the storage available to the partitions?()
A

Allocate the HBA to a client partition.

B

Restart the Virtual I/O Server to detect the changes.

C

Install the device driver for the DS8000 in each of the four AIX partitions.

D

Allocate the HBA to the VIO server partition and install necessary drivers.

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A small organization is purchasing a POWER5 to consolidate four applications. Currently, each application has two Host Bus Adapters (HBA) connected to an Enterprise Storage Server (ESS). The customer is concerned about the cost of purchasing eight new HBAs. Which feature of virtualization will be most beneficial to this organization?()

  • A、Virtual Ethernet
  • B、Micro-Partitioning
  • C、Virtual I/O Server
  • D、Capped and uncapped partitions

正确答案:C

第2题:

Company.com has ordered an 8-way p5-570 and plans to deploy four AIX 5L v5.3 LPARs. The pre-installation system design has all eight processors being placed in the shared processor pool, and four Micro-Partitions being assigned resources from the pool. Prior to the implementation of the system, the customer informs the technical specialist that one of the applications is only supported on AIX 5L 5.2. Which of the following changes to the system design should the technical specialist make to accommodate this change?()

  • A、Create all the partitions as AIX 5.2, each having two dedicated processors.
  • B、Purchase a system with two additional processors that can be assigned to the AIX 5.2 Partition.
  • C、Specify an AIX 5.2 partition using dedicated processors, reducing the number of processors in the shared pool.
  • D、Use the virtual I/O server to manage the disks and network connections removing the need for different levels of device drivers.

正确答案:C

第3题:

A technical specialist has installed a Host Bus Adapter (HBA) on a p5-550 server. The system has four AIX 5L V5.3 partitions and a Virtual I/O server. The HBA will be used to connect all four partitions to a DS8000 storage array. What else must be performed to make the storage available to the partitions?()

  • A、Allocate the HBA to a client partition.
  • B、Restart the Virtual I/O Server to detect the changes.
  • C、Install the device driver for the DS8000 in each of the four AIX partitions.
  • D、Allocate the HBA to the VIO server partition and install necessary drivers.

正确答案:D

第4题:

The pSeries technical specialist is designing a two LPAR p5-570 with eight total processors.  The system is a test system to run AIX 5.2.  The customer has stated a preference for internal disks for the boot devices.  The customer has said they may later need to run three or four LPARs without increasing the number of processors. What should the pSeries technical specialist tell the customer about the ability of the p5-570 to meet their requirements?()

  • A、It will require additional SCSI adapters and I/O drawers or external disks to support more than two LPARs.
  • B、It has sufficient built-in SCSI controllers and disk enclosures to support four total LPARs by only adding the necessary additional disks.
  • C、It is unable to use internal disks for LPARs and therefore additional adapters I/O drawers or external disks must be used to support all LPARs.
  • D、It can support six LPARs with internal disks but will require special features, cables and an adapter to support the additional LPARs with internal disks.

正确答案:B

第5题:

Company.com has four pSeries servers in their data center and wants to deploy multiple Micro-Partitions.  Which of the following data center servers can be used for this purpose?()

  • A、p5-520 running Virtual I/O Server
  • B、p690 running AIX 5L V5.3
  • C、p5-510 running AIX 5L V5.2
  • D、p5-520 running two dedicated processor partitions

正确答案:A

第6题:

The database on a p5-570 Micro-Partition has grown and backups are not meeting the Service Level Agreement. There are several partitions using the Virtual I/O Server to access the storage array. The database backup has high CPU utilization while the others have low CPU utilization. What adjustment can the technical specialist make to ensure that the Service Level Agreement is achieved?()

  • A、Add memory to the database partition to improve response time.
  • B、Add additional Host Bus Adapters to the server to improve IO throughput.
  • C、Modify CPU allocations to favor the database partition.
  • D、Increase CPU allocations to the Virtual I/O Server.

正确答案:C

第7题:

A pSeries technical specialist is designing a p5-550 LPAR solution which will contain four logical partitions.  Which tool should be used to ensure adherence to all partition rules?()

  • A、LVT
  • B、eSAR
  • C、eConfig
  • D、PCRS6000

正确答案:A

第8题:

A system administrator has been instructed to attach storage in their client LPARs, in a Power 770, with fibre channel adapters using N_port ID virtualization (NPIV). Which of the following partitions has the minimum requirements to utilize virtual fibre channel?()

  • A、LPAR-A with 1Gb FC HBA and SAN connection
  • B、LPAR-B with 2Gb FC HBA and SAN connection
  • C、LPAR-C with 4Gb FC HBA and SAN connection
  • D、LPAR-D with 8Gb FC HBA and SAN connection

正确答案:B

第9题:

A Business Partner has proposed an IBM System Storage DS8700 that will have several AIX, Windows, and Sun Solaris servers attached via SAN. The customer has asked for detailed documentation on the steps needed to install the latest adapter drivers.  What is the best document the Business Partner can suggest to accomplish this requirement()

  • A、the IBM System Storage DS8000 Interoperability Matrix
  • B、the IBM System Storage DS8000 Introduction and Planning Guide
  • C、the IBM System Storage DS8000 Host System Attachment Guide
  • D、the IBM System Storage DS8000 User’s Guide

正确答案:C

第10题:

Company.com has a p5-570 with an application running on each of three Micro-Partitions. The disk I/O is shared through a VIO server. A technical specialist has been asked to upgrade the VIO  server. Which of the following procedures should be taken to maintain the integrity of the partitions?()

  • A、Shut down all client partitions before updating the VIO server.
  • B、Disconnect the client partitions from any IP networks before updating the VIO server.
  • C、Update the client partitions to the latest OS maintenance level before updating the VIO Server.
  • D、Update the VIO server while the partitions are running, but reboot each client partition at a convenient time after the update.

正确答案:A

更多相关问题