单选题When planning for a logically partitioned system,which of the following should be used as part of a review to ensure that each partition has the required resources? ()A Use the Workload Estimator capacity planning tool.B Use prtconf output from legacy 

题目
单选题
When planning for a logically partitioned system,which of the following should be used as part of a review to ensure that each partition has the required resources? ()
A

Use the Workload Estimator capacity planning tool.

B

Use prtconf output from legacy systems.

C

Use the LPAR Validation Tool.

D

Use Performance Management Services.

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Company.com wishes to use HACMP on two IBM eServer pSeries servers. During the planning  session, it was decided to use the native serial ports s1 or s2 for a non-IP heartbeat network.  What should be done to ensure the serial network will function with HACMP heartbeats?()  

  • A、 Use either s1 or s2 port configured as a TTY interface with a NULL Modem cable.
  • B、 Use the s2 serial port on each system configured as a TTY interface with a NULL modem cable.
  • C、 Use the s1 port on each system configured as a TTY interface with a standard serial modemcable.
  • D、 Verify with IBM support which native serial ports for the server model can be used for HACM  pheartbeats.

正确答案:D

第2题:

A customer has two Power 770 systems with 4 enclosures each.  Thirty two cores and 1TB of memory are activated on each system.  Each system has 3 database partitions and each partition has 10 cores and 300GB of memory.   Which solution will provide automated recovery of unplanned outages at least cost?()

  • A、Purchase PowerVM Enterprise Edition.Use System Director to automate Live Partition Mobility to recover from partition failure
  • B、Create additional shared processor partitions as standby nodes.Use PowerHA SystemMirror to activate and use CoD resources when a failover occurs
  • C、Purchase an additional 32-core Power 750 with PowerHA SystemMirror Standard Edition.Use the new system as standby node with the XD component of PowerHA
  • D、Purchase an additional Power 770 system.Locate production and standby database partitions on each system.Use DB2 pureScale to provide automated partition monitoring and failover

正确答案:B

第3题:

A graphics card has been added and the system rebooted. When running the lsdev-Cc adapter, the graphics card is not listed in the output. Which of the following actions should be performed?()

A.Reboot system sing the mkdev -l command.

B.Install device support suing the cfgmgr -i command.

C.Use the SMIT console to redirect the console.

D.Use SMIT devices and choose the correct adapter.


参考答案:B

第4题:

Company.com has a single pSeries server with two shared processor logical partitions. The first partition has peak resource requirements during weekdays. The second partition has peak resource requirements during weekends. During the peak times, the total workload between the partitions does NOT exceed the capacity of the server. However, the partitions are not able to utilize the full capacity of the system during peak times, because the necessary CPU and memory resources are not always allocated to the busiest partition. Which of the following options would best balance these resources?()

  • A、Configure AIX Workload Manager
  • B、Configure Partition Load Manager
  • C、Configure eServer Workload Manager
  • D、Use DLPAR from the HMC

正确答案:B

第5题:

A graphics card has been added and the system rebooted. When running the lsdev-Cc adapter, the graphics card is not listed in the output. Which of the following actions should be performed?()

  • A、Reboot system sing the mkdev -l command.
  • B、Install device support suing the cfgmgr -i command.
  • C、Use the SMIT console to redirect the console.
  • D、Use SMIT devices and choose the correct adapter.

正确答案:B

第6题:

When planning for a logically partitioned system,which of the following should be used as part of a review to ensure that each partition has the required resources? ()

  • A、Use the Workload Estimator capacity planning tool.
  • B、Use prtconf output from legacy systems.
  • C、Use the LPAR Validation Tool.
  • D、Use Performance Management Services.

正确答案:C

第7题:

A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system.  How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()

  • A、 Install a VIO server as an additional partition and DLPAR the resources from the existing partition to the VIO server.
  • B、 Create a service partition and install a VIO server. This will automatically move resources to the VIO server on reboot of the managed system.
  • C、 Delete all the existing LPARs, create a new LPAR and assign all the system resources to this LPAR and then install the VIO server on this LPAR.
  • D、 Reset the machine to Manufacturing Default Configuration and install the VIO server on the resulting partition created, which will own all system resources.

正确答案:D

第8题:

Using the following information: Performance data from an existing system that a new system will replace; Performance estimates that anticipate future workloads; Micro-partitioning and logical partitioning implementations. Which of the following allows a technical sales representative to create a system design which can be imported into an HMC?()

  • A、IBMeConfig
  • B、IBM Performance Monitor
  • C、IBM Workload Estimator (WLE)
  • D、IBM System Planning Tool (SPT)

正确答案:D

第9题:

A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()

  • A、 vmstat and iostat data from the older machines 
  • B、 The number of CPUs that were installed in the original machines 
  • C、 Data from Workload Estimator (WLE) and IBM Performance Management (PM) 
  • D、 Performance data that is collected from the new system after it has been put into production

正确答案:C

第10题:

A customer is installing an HMC-managed Power 720 with two partitions, one for Production the other for Testing. They plan to use the Testing partition only occasionally and want to minimize hardware. Which of the following meets these requirements?()

  • A、Create a system profile for each partition. Assign all needed resources as 'required'.
  • B、Define all system resources as 'desired' on the Testing partition. Activate only as needed.
  • C、Create two shared processor pools. Assign the minimal I/O resources required for each partition to the shared pools.
  • D、Create both partitions with minimal 'required' resources, and optional resources as 'desired'. Activate each partition as necessary.

正确答案:D

更多相关问题