单选题A Business Partner is proposing the installation an IBM XIV Storage System at a customer location.  What is the best time to discuss floor space requirements for the solution()A during the Technical Delivery and AssessmentB during installation of the e

题目
单选题
A Business Partner is proposing the installation an IBM XIV Storage System at a customer location.  What is the best time to discuss floor space requirements for the solution()
A

during the Technical Delivery and Assessment

B

during installation of the equipment

C

prior to delivery of the XIV

D

during the solution proposal

参考答案和解析
正确答案: C
解析: 暂无解析
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A customer recently installed new a SAN with an IBM System Storage DS8700 and several open systems servers to address a need for storage consolidation and still provide good response time. They have asked the Business Partner technical representative for the most complete IBM product that would allow them to do performance reporting of the new SAN environment.  What is the best solution()

  • A、Tivoli Storage Manager
  • B、Tivoli Storage Productivity Center for Disk
  • C、Tivoli Storage Productivity Center Basic Edition
  • D、Tivoli Storage Productivity Center Standard Edition

正确答案:D

第2题:

A Business Partner storage specialist is proposing an IBM System Storage DS5000 solution to aninstalled EMC customer. Which IBM resource should the Business Partner engage to assist withcompetitive sales strategies against EMC?()

  • A、Competeline 
  • B、Executive Briefing Center 
  • C、Competitive Benchmark Center 
  • D、Field Technical Support Specialist (FTSS)

正确答案:A

第3题:

A customer is purchasing an IBM System Storage DS8700. What is the most important first step for the installation?()

A. verify configuration

B. conduct pre-install TDA

C. complete physical planning

D. verify the solution meets requirements


参考答案:B

第4题:

A customer is purchasing an IBM System Storage DS8700. What is the most important first step for the installation?()

  • A、verify configuration
  • B、conduct pre-install TDA
  • C、complete physical planning
  • D、verify the solution meets requirements

正确答案:B

第5题:

A customer has an IBM System Storage DS8100 with 128 DDMs and needs to add additional capacity.  What must be verified by the Business Partner during the visit to the computer room()

  • A、the space for the upgrade to a DS8700
  • B、the space on the left of the DS8000 for an expansion frame
  • C、the space on the right of the DS8000 for an expansion frame
  • D、the space to install additional DDMs in the base frame

正确答案:C

第6题:

An IBM Business Partner has sold a DS5020 and new IBM SAN switches to replace a customer EMC storage infrastructure. The customer dissatisfaction has arisen during the installation because according to the DS5020 interoperability matrix, two HP Proliant servers running Exchange have FC HBAs that are not supported. Which of the following is the most probable cause of the customer dissatisfaction()

  • A、The EMC storage specialist has not participated in the TDA meeting
  • B、The FC HBAs are 4 Gbps technology
  • C、The Technical and Delivery Assessment review actions were not executed
  • D、The customer should have checked that the HBAs are supported according to the HP storage interoperability matrix

正确答案:C

第7题:

A customer recently installed new SAN with an IBM System Storage DS8300 and several open systems servers to address a need for storage consolidation and still provide  good response time. They have asked the Business Partner technical representative for the most complete IBM product that would allow them to do performance reporting of the new SAN environment.  What is the best solution()

  • A、Tivoli Storage Manager
  • B、Total Productivity Productivity Center for Disk
  • C、Total Productivity Center Basic Edition
  • D、Total Storage Productivity Center Standard Edition

正确答案:D

第8题:

A bank has requested proposals for a storage solution to implement disaster recovery processes for their IBM System z configured with Linux, IBM System p configured with AIX, and Microsoft Windows environments. The solution must simulate a multi-site environment and provide the customer the ability to evaluate Metro Mirror, Global Mirror, and FlashCopy. Floor space is limited.What hardware platform provides this native support?()

A. IBM XIV Storage System

B. IBM System Storage DS5300

C. IBM System Storage DS8800

D. IBM System Storage DS5020 with SVC


参考答案:C

第9题:

A customer is considering the purchase of an XIV system to leverage thin provisioning. They are concerned that their application will use all available space during formatting, which will remove any thin provisioning benefits. What should the storage specialist discuss with the customer?()

  • A、the possibility of changing the application so this no longer happens
  • B、with the XIV system's SATA basedapproach, storage costs are so low that over-provisioning is not an issue
  • C、the XIV system has immediate zero page reclamation features that will immediately return the volume to its original size
  • D、the XIV system has a white space reclamation feature that will return the volume to its original thin provisioned size over time

正确答案:D

第10题:

An IBM Business Partner sells an IBM System Storage DS8700 to a customer.  Who is responsible for the installation and set up of the storage server()

  • A、purchasing customer
  • B、IBM Installation Readiness Team
  • C、IBM Customer Engineer
  • D、IBM Business Partner

正确答案:C