问题:单选题A p5 570 12 way was purchased with the plan to install six LPARs running AIX 5.2. The machine has 12 disks spread evenly over the internal server drawers. The customer would now like to add a seventh LPAR. Which of the following should be added for the seventh LPAR boot device?()A An additional 7311-D10 drawerB An adapter to boot off a SAN deviceC An additional disk to the media bayD Two disks to the internal configuration
查看答案
问题:单选题Companycom needs to run a 32 bit kernel under AIX 5.3. What steps need to be done to accomplish this with the least disruption since the system is already installed with a 64 bit kernel?()A Reload the operating system and select 32 bit kernel on initial install.B Repoint the symbolic link of /unix to unix_mp. Perform a bosboot and reboot the partition.C Use the SMIT menu to select 32 bit versus the 64 bit kernel. Select 32 bits and reboot the partition.D Go into SMIT and select 32 bit kernel. Run the /usr/sbin/bootinfo -K command, and ensure that the kernel has been changed.
问题:单选题Companycom has several AS/400 servers in their IT infrastructure running V5R2 that they wish to consolidate. The customer wants to simplify their environment and install i5/OS on a p5 590 with 16 1.65GHz processors and 20 i5/OS partitions. The customer plans to use the Advanced Power Virtualization to share their storage, processors, and memory. What considerations and limitations should be reviewed with the customer before the purchase?()A Resources cannot be shared with an i5 partition when it is put on a pSeries. The i5 partition needs its own 9411-100 tower because of IOP. V5R3 OS or later is required. There is a maximum of two partitions in a 590.B Resources cannot be shared between partitions when i5/OS is put on a pSeries. The i5 partition needs its own 9411-100 tower because of IOP. i5/OS can be at V5R2 or a V5R3. Currently only one i5 partition is allowed. C V5R3 is required for the i5 partitions. Virtual IO Server is not supported for the i5/OS partitions to share storage. Up to 10 i5 partitions per processor are allowed (a maximum of two processors for up to 20 partitions). D Processor and memory resources can be shared between AIX 5L, Linux and i5/os partitions. i5/OS needs to be at V5R3, and Virtual IO Server is not supported for the i5/OS partition to share storage. On a 1.65 GHz POWER5 p5 590 there is a maximum of one partition.
问题:单选题Companycom is planning to do server consolidation on POWER5. The customer has a test environment, a QA environment and a production environment for two applications. Both the test and QA environments are very small and are only utilized when new releases are being developed and tested. They require less than 1 CPU each. Both production applications require 2 CPUs for day-to-day operation and can require up to an additional 2 CPUs each during abrupt peak requirements. What is the best design for the LPARs?()A Use micropartitioning for test and QA environments, and DLPAR for the production applications B Use micropartitioning for test and QA environment, and CPU pooling for the production applications C Create standard LPARs for all test, QA, and production applications to keep all partitions separate and isolated. D Create DLPAR partitions for all test, QA, and production applications to keep test from disturbing production environment.
问题:单选题Companycom is moving their application to a p5 590 and at the same time moving to a new version of the application. The customer knows only about the resource requirements of the old version. Which of the following is the best method to migrate their application to POWER5?()A Add CPU and memory COD so they have room to grow if requiredB Make the server configuration twice as large as the current requirementC Configure the server for the current capacity requirementsD Make the server configuration a little larger than the current capacity requirements
问题:单选题Companycom wants the application server LPAR to communicate with the database LPAR on a p5 590 without using network adapters. What does the customer need to install?()A VIO ServerB AIX 5.2 ML4C Shared Ethernet AdapterD AIX 5.3 with Advanced Power Virtualization
问题:单选题Companycom is buying an application solution that bases its software licensing on the number of CPUs per machine. They will be running two instances of this application and will require 8 CPUs each. A second application is priced based on CPUs per LPAR as well as the class of machine. That application will require 8 CPUs. What is the best hardware to propose to keep the software cost low?()A A 24 way p5 595 with 3 LPARsB A 24 way p5 595 with 2 LPARsC One p5 570s 16 way and one p5 570 8 wayD One p5 595 12 way active and 12 way inactive, and one p5 570 8 way
问题:单选题Which Virtual IO Server function allows disk to be shared by multiple LPARs?()A Virtual LANB Virtual diskC Virtual SCSID Virtual serial
问题:单选题After using the alt_disk_install command to clone a system image to another disk, the system administrator noticed a large number of defined devices not allocated to the LPAR. Which of the following is the most likely cause of this situation?()A The cfgmgr command was not run to reconfigure the devicesB The machine was not booted into SMS MultiBoot mode after configurationC The machine was not in full system partition mode when the volume was createdD The alt_disk_install command was not run with the -O option to remove references in the ODM
问题:单选题What type of configuration can provide the best availability in a Virtual IO Server environment?()A Provide multiple paths to all resources through 2 or more Virtual IO ServersB Mirror all disk resources on the Virtual IO Server to present to the client LPARC Mirror all disk resources on the client LPAR to the shared SCSI on the Virtual IO ServerD Trunk multiple Ethernet adapters on the Virtual IO Server to a single Shared Ethernet Adapter (SEA)
问题:单选题Companycom is considering a partitioned solution with one of the LPARs utilizing 12 CPUs. Multiple applications will be loaded on this large LPAR. However, the customer wants to ensure some tasks will have higher priority access to the CPU and memory resources. Which of the following solutions would best satisfy the requirement?()A LoadlevelerB AIX Workload ManagerC Partition Load ManagerD Tivoli Provisioning Manager
问题:单选题Companycom is purchasing a 64-way p5 595. They have determined the location for the server is in a datacenter which does not have a raised floor. Which of the following would best meet the server requirements?()A The server must be installed into a location with a raised floor for optimum system cooling and cable management.B The server should be purchased as a p5 590 and then upgraded to a p5 595. This will eliminate the need for a raised floor environment.C The server should be purchased as 32-way p5 595 and then upgraded to a 64-way. This will eliminate the need for a raised floor environment.D The server can be installed into a location without a raised floor if an RPQ is obtained. It is a strong IBM recommendation for a raised floor, not a requirement.
问题:单选题A company wants to buy memory efficiently on their p5 590 to allow for the best performance. What is the best practice for adding memory for performance?()A Install more cards of smaller capacity and same size across MCMs. Use DDR2(dual data rate) memory if using HPC (High Performance Computing). B Install fewer cards of larger capacity of the same size across MCMs. Servers with one processor book must have a minimum of four memory cards installed. C Intermix DDR1 and DDR2 memory so that partitions requiring the higher performance can take advantage of them. Half of the available memory slots in the system should contain memory. D Use fewer higher density memory cards so that a few memory slots are left open for future growth. Each processor book provides sixteen memory card slots. The p5 590 supports a maximum of 64 memory cards.
问题:单选题Companycom has seven days of vmstat data on four p5 590 production LPARs of four processors each. The data shows that all four LPARs have periodic utilizations of 90-95% lasting several minutes in duration. However, the average utilizations of the four LPARs were between 15-30%. The vmstat data shows that the peak utilizations of each LPAR do not occur at the same time. Which of the following should be set up?()A A shared pool with four capped LPARsB A shared pool with four uncapped LPARsC Four dedicated LPARs and use DLPAR to manage resources effectivelyD The server in SMP mode and use WLM to manage resources effectively
问题:单选题Companycom is installing a Virtual IO Server to reduce the number of fibre channel adapters needed for each partition. The customer wants to use disk based copy functions to replicate the data on the LUNs. How can this be accomplished?()A Create LVM mirrors between LUNsB MPIO is necessary as the device driverC Use separate fibre adapters in the Virtual IO Server for each LUND Virtual IO Server is a disk subsystem and must control the LUNs behind it
问题:单选题Companycom has several CR3 HMCs managing their p690 servers. They have purchased a new p5 570 and would like to manage the new system with an existing HMC. What is required to support this environment?()A Free up one HMC and update the software for use with the p5 570B Connect the new p5 570 server to an existing HMC and manage the p690s and p5 570 from that HMCC Order a new HMC to support the new p5 570 server since the CR3 HMC is not supported for a p5 570D Backup the HMC to DVD-RAM and select HMC migrate to move all the profile data to the new HMC software
问题:单选题Companycom informs the system administrator that there is concern about the Electronic Service Agent and security. What can be said about Electronic Service Agent that will address concerns about security?()A All Service Agent transactions are inbound requests secured by encryption (cryptographic processor card) Kerberos, and Hypertext Transfer Protocol Secure (HTTPS). B The AT&T Global Network Services (AGNS ) phone connection generates system IDs and passwords for the client every six months. Service Agent has no inbound capability.C All Service Agent transactions are outbound requests secured by encryption (Hypertext Transfer Protocol Secure (HTTPS) or POST). Service Agent has no inbound capability. D The transmissions from Service Agent can be either by Internet or the AT&T Global Network Services (AGNS) phone connection. Service Agent transactions are inbound requests generated by a point to point connection.
问题:单选题What is a primary differentiator between pSeries eWLM (Enterprise Workload Manager) and WLM (Workload Manager)?()A pSeries eWLM can create classes while pSeries WLM can create tiers.B pSeries eWLM can create tiers while pSeries WLM can create classes.C pSeries eWLM is implemented over multiple O/S images while pSeries WLM is implemented within an individual O/S image.D pSeries eWLM is implemented within an individual O/S image while pSeries WLM is implemented over multiple O/S images.
问题:单选题The HMC software has just been upgraded remotely via the WebSM client. It now needs to be rebooted to make the update active. How can this be accomplished?()A Use ssh to connect to the HMC and rebootB The upgrade will display complete and ask you to rebootC Select shutdown in the Management section of the WebSM clientD Once logged out of the WebSM client it will ask to logoff, shutdown or reboot. Select reboot.