A requirements specification is( ).A.a rough list of things that the proposed software o

题目

A requirements specification is( ).

A.a rough list of things that the proposed software ought to do

B.a precise list of things that the proposed software ought to do

C.a formal list of things that the proposed software must do

D.an estimate of the resources (time,money,personnel,etc)which will be required to construct the proposed software .

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

In which phase of the software engineering process is the Software Requirements Specification developed?

A. definition phase

B.engineering

C.maintenance

D.development phase


正确答案:A

第2题:

● Many of the activities performed during the preliminary investigation are still being conducted in (71) , but in much greater depth than before. During this phase, the analyst must become fully aware of the (72) and must develop enough knowledge about the (73) and the existing systems to enable an effective solution to be proposed and implemented. Besides the (74) for process and data of current system, the deliverable from this phase also includes the (75) for the proposed system.

(71)

A. analysis phase

B. design phase

C. implementation phase

D. maintenance phase

(72)

A. main symptom

B. root problem

C. final blueprint

D. data specification

(73)

A. hardware environment

B. testing environment

C. software environment

D. business environment

(74)

A. logical models

B. physical models

C. design models

D. implementation models

(75)

A. hardware and software specification

B. system performance specification

C. formal requirements definition

D. general problem statement


正确答案:A,B,D,A,C

第3题:

The review for the specification completeness is performed during which of the following cycles.

A Award cycles

B requirements cycle

C requisition cycle

D solicitation cycle

E contractual cycle


正确答案:C

第4题:

Before a project schedule can be created,the schedule maker should have a(),an effort estimate for each task,and a resource list with availability for each resource

A.work breakdown structure

B.baseline

C.software requirements specification

D.plan


正确答案:A
解析:制定项目进度计划之前,制定计划者需要()、各任务的工作量估计以及可能得到的资源列表A、分解结构B、基线C、软件需求描述D、计划

第5题:

The purpose of the requirements definition phase is to produce a clear, complete, consistent, and testable(71 )of the technical requirements for the software product.During the requirements definition phase, the requirements definition team uses an iterative process to expand a broad statement of the system requirements into a complete and detailed specification of each function that the sofrware must perform. and each(72)that it must meet. The starting point is usually a set of high-level requirements from the(73)that describe the project or problem.In either case, the requirements definition team formulates an overall concept for the system and then defines(74)showing how the system will be operated, publishes the system and operations concept document, and conducts a system concept review(SCR).Following the SCR, the team derives(75)requirements for the system from the high level requirements and the system and operations concept. Using structured or object-oriented analysis, the team specifies the software functions and algorithms needed to satisfy each detailed requirement.

A.function

B.definition

C.specification

D.statement


正确答案:C
解析:需求定义阶段的作用就是为软件产品产生一个清晰的、完整的、一致的、可测试的技术需求规格说明。在需求定义阶段,需求定义团队通过迭代过程把有关节系统需求的宽泛的陈述扩展成系列化统必须实现的各个功能的、完整而详细的规格说明,以及系列化统应该满足的各种准则。这个过程的起点通常是由用户提供的描述项目或问题的一组高级需求。在任何情况下,需求定义团队应该阐明与系统有关的整体概念,并且设定一种能够显示系统如何运作的情景,发布有关系统和运行的概念文档,并进行系统概念的评审(SCR)。在SCR之后,团队应该根据高级需求和系统运行概念导出详细的系统需求。通过结构化的或面向对象的分析技术,团队可以规范系统功能,说明满足每一细节需求的算法。

第6题:

●The purpose of the requirements definition phase is to produce a clear,complete,consistent,and testable (66) of the technical requirements for the software product.

During the requirements definition phase,the requirements definition team uses an iterative process to expand a broad statement of the system requirements into a complete and detailed specification of each function that the software must perform. and each (67) that it must meet.The starting point is usually a set of high-level requirements from the (68) that describe the project or problem.

In either case,the requirements definition team formulates an overall concept for the system and the defines (69) showing how the system will be operated,publishes the system and operation concept documents,and conducts a system concept review(SCR).

Following the SCR,the team derives (70) requirements for the system from the highlevel requirements and the system operations concept.Using structured or object-oriented analysis,the team specifies the software functions and algorithms needed to satisfy each detailed requirements.

(66) A.function

B.definition

C.specification

D.statement

(67) A.criterion

B.standard

C.model

D.system

(68) A.producer

B.customer

C.programmer

D.analyser

(69) A.rules

B.principles

C.scenarios

D.scenes

(70) A.detailed

B.outlined

C.total

D.complete


正确答案:C,A,B,C,A
【解析】需求定义阶段的作用就是为软件产品产生一个清晰的、完整的、一致的、可测试的技术需求规格说明。
在需求定义阶段,需求定义团队通过迭代过程把有关系统需求的宽泛的陈述扩展成系统必须实现的各个功能的、完整而详细的规格说明,以及系统应该满足的各种准则。这个过程的起点通常是由用户提供的描述项目或问题的一组高级需求。
在任何情况下,需求定义团队应该阐明与系统有关的整体概念,并且设定一种能够显示系统如何运作的情景,发布有关系统和运行的概念文件,并进行系统概念的评审(SCR)。
在SCR之后,团队应该根据高级需求和系统运行概念导出详细的系统需求。通过结构化的或面向对象的分析技术,团队可以规范系统功能,说明满足每一细节需求的算法。

第7题:

● Software (71) refers to that the software to meet the specification must be produced.

(71)

A. test

B. support

C. development

D. process


正确答案:C

第8题:

●In which phase of the software engineering process is the Software Requirements Specification developed? (68) .

(68) A.development phase

B.engineering phase

C.maintenance phase

D.Definition phase


正确答案:D
【解析】软件需求说明在软件开发的哪个周期阶段出来?

第9题:

Computer systems consist of two very different types of elements: Hardware, which includes all the physical things that can be touched and(71)which tells the hardware how to do.

A.Operating system

B.I/O devices

C.Courseware

D.Software


正确答案:D
解析:计算机系统由两种完全不同类型的部分组成:硬件(我们能触摸到的所有物体)和软件(告诉硬件怎样做)。

第10题:

Which of the following procedures correctly lists the prerequisite software that requires installation with an AIX licensed program product?()

A.Use the lppdiff command to list the contents

B.Use the installp -Q command to list the contents

C.Choose the SMIT option to Preview Install Only

D.Choose the SMIT option to list dependents of a software product


参考答案:C

更多相关问题