A requirements specification is( ).
A.a rough list of things that the proposed software ought to do
B.a precise list of things that the proposed software ought to do
C.a formal list of things that the proposed software must do
D.an estimate of the resources (time,money,personnel,etc)which will be required to construct the proposed software .
第1题:
In which phase of the software engineering process is the Software Requirements Specification developed?
A. definition phase
B.engineering
C.maintenance
D.development phase
第2题:
● Many of the activities performed during the preliminary investigation are still being conducted in (71) , but in much greater depth than before. During this phase, the analyst must become fully aware of the (72) and must develop enough knowledge about the (73) and the existing systems to enable an effective solution to be proposed and implemented. Besides the (74) for process and data of current system, the deliverable from this phase also includes the (75) for the proposed system.
(71)
A. analysis phase
B. design phase
C. implementation phase
D. maintenance phase
(72)
A. main symptom
B. root problem
C. final blueprint
D. data specification
(73)
A. hardware environment
B. testing environment
C. software environment
D. business environment
(74)
A. logical models
B. physical models
C. design models
D. implementation models
(75)
A. hardware and software specification
B. system performance specification
C. formal requirements definition
D. general problem statement
第3题:
The review for the specification completeness is performed during which of the following cycles.
A Award cycles
B requirements cycle
C requisition cycle
D solicitation cycle
E contractual cycle
第4题:
Before a project schedule can be created,the schedule maker should have a(),an effort estimate for each task,and a resource list with availability for each resource
A.work breakdown structure
B.baseline
C.software requirements specification
D.plan
第5题:
The purpose of the requirements definition phase is to produce a clear, complete, consistent, and testable(71 )of the technical requirements for the software product.During the requirements definition phase, the requirements definition team uses an iterative process to expand a broad statement of the system requirements into a complete and detailed specification of each function that the sofrware must perform. and each(72)that it must meet. The starting point is usually a set of high-level requirements from the(73)that describe the project or problem.In either case, the requirements definition team formulates an overall concept for the system and then defines(74)showing how the system will be operated, publishes the system and operations concept document, and conducts a system concept review(SCR).Following the SCR, the team derives(75)requirements for the system from the high level requirements and the system and operations concept. Using structured or object-oriented analysis, the team specifies the software functions and algorithms needed to satisfy each detailed requirement.
A.function
B.definition
C.specification
D.statement
第6题:
●The purpose of the requirements definition phase is to produce a clear,complete,consistent,and testable (66) of the technical requirements for the software product.
During the requirements definition phase,the requirements definition team uses an iterative process to expand a broad statement of the system requirements into a complete and detailed specification of each function that the software must perform. and each (67) that it must meet.The starting point is usually a set of high-level requirements from the (68) that describe the project or problem.
In either case,the requirements definition team formulates an overall concept for the system and the defines (69) showing how the system will be operated,publishes the system and operation concept documents,and conducts a system concept review(SCR).
Following the SCR,the team derives (70) requirements for the system from the highlevel requirements and the system operations concept.Using structured or object-oriented analysis,the team specifies the software functions and algorithms needed to satisfy each detailed requirements.
(66) A.function
B.definition
C.specification
D.statement
(67) A.criterion
B.standard
C.model
D.system
(68) A.producer
B.customer
C.programmer
D.analyser
(69) A.rules
B.principles
C.scenarios
D.scenes
(70) A.detailed
B.outlined
C.total
D.complete
第7题:
● Software (71) refers to that the software to meet the specification must be produced.
(71)
A. test
B. support
C. development
D. process
第8题:
●In which phase of the software engineering process is the Software Requirements Specification developed? (68) .
(68) A.development phase
B.engineering phase
C.maintenance phase
D.Definition phase
第9题:
Computer systems consist of two very different types of elements: Hardware, which includes all the physical things that can be touched and(71)which tells the hardware how to do.
A.Operating system
B.I/O devices
C.Courseware
D.Software
第10题:
A.Use the lppdiff command to list the contents
B.Use the installp -Q command to list the contents
C.Choose the SMIT option to Preview Install Only
D.Choose the SMIT option to list dependents of a software product