Customer X has 

题目

Customer X has a hub-and-spoke Frame Relay network, with a central office and two branch offices (RemoteA and RemoteB). Each location has only one physical link to the Frame Relay cloud and RemoteB has a router that is not a Cisco router. Since the installation, there is no connectivity between RemoteB and the central office. What is a possible solution to this issue? ()

  • A、 Because Frame Relay IETF encapsulation is only configurable at interface level, you must use IETF encapsulation on all routers.
  • B、 This is not a possible scenario. A dedicated Frame Relay link to RemoteB is mandatory at the central office.
  • C、 The router at RemoteB must be replaced by a Cisco router.
  • D、 Use Frame Relay IETF encapsulation on a per-VC basis on the central office router.
  • E、 There is a problem in the Frame Relay cloud, because Cisco routers are compatible with IETF Frame Relay.
参考答案和解析
正确答案:D
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A customer has a very large number of physical Windows-based servers and no centralized storage. Which technology solution will help the customer to reduce the footprint of their existing server estate?()

A. z/OS, DS8000, TSM

B. TSM, LTO-5, VMware

C. System x, VMware, XIV

D. System p, VMware, DS5000


参考答案:C

第2题:

A customer has a mixed environment of AIX on POWER4 and POWER5, and x86 based systems running a supported distribution of Linux. There is a total of 7 partitions and three standalone x86 servers. The customer wants to consolidate their applications using a single 4-core POWER6 server.  What is the minimum PowerVM edition that supports the customer requirement?()

  • A、 PowerVM Lx86
  • B、 PowerVM Express Edition
  • C、 PowerVM Standard Edition
  • D、 PowerVM Enterprise Edition

正确答案:C

第3题:

听力原文:If a customer informs his bank that a draft which has been issued to him has been lost, the drawee bank should be noticed immediately.

(8)

A.The customer should first notify the drawee bank of the loss of his draft.

B.The customer should first notify the drawer bank of the loss of his draft.

C.The customer should first notify the remitting bank of the loss of his draft.

D.The customer should first notify the collecting bank of the loss of his draft.


正确答案:B
解析:单句意思为“当客户丢失了银行开给他的汇票,则应立即通知付款行。”

第4题:

Machine policy templates can be assigned based on certain attributes of a machine. A customer  organizes their machines based on the following requirements:   The machines are all placed in specific Organizational Units in the Active Directory.   The customer has Citrix Servers, and they have a specific naming convention meant only for their Citrix Servers. The customer has DHCP enabled for all the client machines.   The customer has made it clear that they should not need to change anything in the existing infrastructure. Given these requirements, which single assignment attribute would be chosen for assigning machine policy templates?()

  • A、Hostnames
  • B、IP Addresses
  • C、Machine Group Tag
  • D、Active Directory Groups

正确答案:C

第5题:

A customer receives a CD-RW disk from a computer vendor. The customer tries to read the disk in a computer with a 4X CD-ROM drive and is unable to read any information. The customer tries the CD-RW disk on a 32X CD-ROM drive and it reads correctly. What is the cause of this problem?()

  • A、The 4X CD-ROM drive has dirty optics or laser and requires cleaning.
  • B、The 4X CD-ROM drive needs to be jumpered to support CD-RW disks.
  • C、The 4X CD-ROM drive does not support the multi-read specification.
  • D、The 4X CD-ROM is fine, but the CD-RW disk has a flaw in its format.

正确答案:C

第6题:

The most important customer a technician has is:()

  • A、the customer standing right in front of them.
  • B、the customer who owes the company the most money.
  • C、the customer calling on the phone.
  • D、the customer they have an appointment with in an hour.

正确答案:A

第7题:

An SMB customer requires a tower server with 2TB of internal storage. The customer has requested a low cost solution.  What IBM System x server would satisfy this criteria?()

  • A、x3250
  • B、x3200
  • C、x3650
  • D、x3400

正确答案:B

第8题:

The most important customer a technician has is:()

A. the customer standing right in front of them.

B. the customer who owes the company the most money.

C. the customer calling on the phone.

D. the customer they have an appointment with in an hour.


参考答案:A

第9题:

A customer has a requirement for a server to run Windows Server 2003 Enterprise Edition and Exchange 2003 Enterprise Edition. It has been determined that 4GB RAM will be needed.  The customer is trying to decide between the two following configurations:   (1)An IBM xSeries x366 with 4 Xeon MP processors and 4 x 1GB memory DIMMs.       (2)An IBM xSeries x445 with 4 Xeon MP processors and 8 x 1GB memory DIMMs.  Which question should be asked to guide the customer in selecting the correct memory configuration?()

  • A、Is rack space an issue?
  • B、Is there a high cache-hit ratio?
  • C、Is this a mission-critical application?
  • D、Are there plans to expand the memory to 8GB in the future?

正确答案:C

第10题:

A customer has a very large number of physical Windows-based servers and no centralized storage. Which technology solution will help the customer to reduce the footprint of their existing server estate?()

  • A、z/OS, DS8000, TSM
  • B、TSM, LTO-5, VMware
  • C、System x, VMware, XIV
  • D、System p, VMware, DS5000

正确答案:C

更多相关问题