New AIX systems arrive without a CDROM drive. All systems do not have the system hardware configuration. Which of the following options is the most appropriate way to install AIX on the systems?()A、Install CDROM drives or tape drives on the systems becaus

题目

New AIX systems arrive without a CDROM drive. All systems do not have the system hardware configuration. Which of the following options is the most appropriate way to install AIX on the systems?()

  • A、Install CDROM drives or tape drives on the systems because that is the only way to install AIX.
  • B、Install one system. Take a mksysb from the first system and resotre the mksysb to the remaining systems.
  • C、Install one system. Mirror rootvg onto a disk from each of the remaining systems.
  • D、Setup and NIM master and resources.
参考答案和解析
正确答案:D
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

The purpose of the systems analysis phase is to build a logical model of the new system.The first step is(71),where you investigate business processes and document what the new system must do to satisfy users. This step continues the investigation that began during the(72). You use the fact-finding results to build business models,data and process models,and object models. The deliverable for the systems analysis phase is the(73),which describes management and user requirements,costs and benefits,and outlines alternative development strategies.The purpose of the systems design phase is to create a physical model that will satisfy all documented requirements for the system. During the systems design phase,you need to determine the(74),which programmers will use to transform the logical design into program modules and code. The deliverable for this phase is the(75),which is presented to management and users for review and approval.

A.systems planning phase
B.systems modeling phase
C.systems analysis phase
D.systems design phase

答案:A
解析:
翻译:系统分析阶段的目的是建立新系统的逻辑模型,第一步就是进行(71),调查业务流程并记录新系统必须做哪些以满足用户需求。这一步是(72)的延续,可以使用调查结果构建业务模型,数据和流程模型以及对象模型。系统分析阶段的可交付成果是(73),它描述了管理和用户要求,成本和收益,还有可替代的方案。系统设计阶段的目的是创建一个能够满足系统所有需求文件要求的物理模型。 在系统设计阶段,需要确定(74),程序员通过系统过程模型把逻辑设计转换为程序模块和代码。该阶段的可交付成果是(75),提交给管理层和用户审查和批准。(72) A.系统计划阶段B.系统建模阶段C.系统分析阶段 D.系统设计阶段
参考答案:(72)A

第2题:

A data center has had a power outage. Which of the following should the administrator do FIRST once the power is restored? ()

  • A、 Identify which systems are the most critical and bring them up by level of importance.
  • B、 Retrieve the latest backup tapes for immediate system restore using the GFS rotation.
  • C、 Identify the least critical systems and then power those systems on first.
  • D、 Determine the cause of the power outage and install UPS systems to prevent its reoccurrence.

正确答案:A

第3题:

One use of networks is to let several computers share ______ such as file systems, printers, and tape drives.

A.CPU

B.memory

C.resources

D.data


正确答案:C
解析:译文的含义是:网络的作用之一是,让多台计算机共享诸如文件系统、打印机和磁带机等()。A、B、C、D各选项的意思分别是:中央处理器、内存、资源、数据。

第4题:

A customer with p615, p630 and p650 pSeries servers installed and running AIX is considering Linux as an additional environment. Which Linux capabilities can the pSeries Sales Specialist present as choices that are available to enhance the existing systems?()

  • A、Linux will be restricted to the p650 system, as it is not supported on the p630.
  • B、The customer can run Linux on all the existing systems with or without the presence of AIX.
  • C、Linux can run in LPARs on the existing systems but Linux will require the presence of AIX in at least one LPAR.
  • D、Linux can be installed on all existing systems but will require the AIX Linux Affinity libraries to boot the systems and run Linux.

正确答案:B

第5题:

A customer has a Linux server farm and wants to use IBM Director to manage all of their systems.  Which of the following is the preferred installation of IBM Director to fully manage the Linux systems?()

  • A、Install Director Server on a Windows 2000 Server and install the Director agents on the Linux systems.
  • B、Install IBM Director Agent on a Linux server and install the Director Server on the Linux systems.
  • C、Install the Director Server on a Linux server and manage the systems via Linux native SNMP support.
  • D、Install Director Server on a Linux server and install the Director Linux agent on the Linux systems.

正确答案:D

第6题:

Which of the following is the MOST important step in any disaster recovery plan?()

  • A、 Appropriate use of backup media and offsite storage
  • B、 The disaster recovery testing process过程
  • C、 Classifying systems according to operational impact
  • D、 Use appropriate fire suppressant systems

正确答案:B

第7题:

Companycom is migrating from p670 systems running AIX 5.2 to p5 595 systems running AIX 5.3. They will be changing out only the system units. They will re-use the existing 61D drawers and adapters with the new p5 595 systems. What compatibility issue must be considered?() 

  • A、APV features are not supported for some legacy POWER4 adapters
  • B、APV will require the most current maintenance level for AIX 5.2
  • C、APV features will require that legacy POWER4 adapters be updated with new microcode
  • D、The Virtual IO Server must run AIX 5.3 and the LPARs can run either AIX 5.2 or AIX 5.3

正确答案:A

第8题:

During an AIX installation, which of the following actions will occur once the Complete Overwrite option is selected?()

A.All new disks in the system will be formatted

B.Only the contents of the root volume group destination disks will be destroyed

C.All file systems, including /(root), /tmp, /usr, and /var, but no usr data in the root volume group, will be destroyed

D.The contents of all disks on the system, even if they are not shown as the destination root volume group disks, will be destroyed


参考答案:B

第9题:

A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700.  They would like to upgrade and plan for 40 TB capacity.  The customer needs to move to a more scalable storage system to include all servers.Which of the following would be most appropriate to ask first?()

  • A、What are the plans for Disaster Recovery? 
  • B、What are the plans for data migration? 
  • C、Would iSCSI meet your needs? 
  • D、How much space is available in the current storage systems?

正确答案:B

第10题:

A customer has 15 IBM x365 servers in a rack environment and is using IBM Director for systems management.  They require the ability to restart any server independent of the operating system.  Which of the following is the most cost-effective solution?()

  • A、Interconnect the service processors and use the IBM Director Agent
  • B、Install RSA II in each server and chain together the systems management processors
  • C、Install the RSA II in the top server and chain together the service processor interconnect
  • D、Install the IBM Director Agent on each server and use the remote control function to restart the servers

正确答案:C