A customer plans to purchase a p5-570 that will run in SMP mode to host a large financial database on AIX 5.2.  The application is sized for an 8-way 1.65-GHz machine.  They do not currently have an existing HMC that supports p5 machines. This organizatio

题目

A customer plans to purchase a p5-570 that will run in SMP mode to host a large financial database on AIX 5.2.  The application is sized for an 8-way 1.65-GHz machine.  They do not currently have an existing HMC that supports p5 machines. This organization experiences unpredictable short-term spikes in processor utilization.  To mitigate the risk to their business, they are interested in IBM’s CoD offering.  In addition to the 8-way system, what else should the pSeries technical specialist recommend to the customer?()

  • A、Another p5-570 building block
  • B、Capacity Backup p5-570 building block
  • C、Another p5-570 building block and at least one HMC
  • D、Capacity Backup p5-570 building block and at least one HMC
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A customer has an 8-way p5-570 with eight internal disk drives and AIX 5.2.  Which of the following must be added, if anything, to the configuration to support four LPARs, assuming each LPAR requires twodisk drives?()

  • A、7311-D20 drawer with four disks
  • B、Upgrade to AIX 5.3
  • C、Fiber adapters to attach to SAN
  • D、Nothing

正确答案:D

第2题:

Companycom is currently using a p690 and has just ordered a p5 590. They prefer to run in full system partition mode, since their application will utilize all the resources in the machine, and they don't want the overhead of an LPAR. What is the best response to the customer about the POWER5 capabilities?()

  • A、POWER5 runs in an SMP mode as default
  • B、POWER5 can run in a full system mode the same as the p690
  • C、POWER5 can run in full system mode with the purchase of PLM
  • D、POWER5 can run in a full system mode, but it is in LPAR mode

正确答案:D

第3题:

A customer wants to run eight production partitions each with the following:   ? 0.7 CPU 1.65-GHz   ? 4GB of RAM   ? 2 Ethernet adapters   They do not have room for many RIO drawers since rack space is currently scarce in their data center.  They have significant unused SAN attached disk.  In addition to the Advanced POWER Virtualization feature, which of the following is the minimum recommended configuration needed to meet the customer’s requirements?()

  • A、p5-570 6-way 1.65-GHz, 32GB
  • B、p5-570 8-way 1.65-GHz, 32GB
  • C、p5-570 6-way 1.65-GHz, 48GB
  • D、p5-570 8-way 1.65-GHz, 48GB

正确答案:D

第4题:

A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()

  • A、Purchase a second HMC and use this to manage the new servers.
  • B、Connect all of the new servers to the existing private HMC network.
  • C、Configure a second private network on their existing HMC for the new servers.
  • D、Connect 9 of the new servers to the existing HMC and use Integrated Virtualization Manager on the 10th.

正确答案:B

第5题:

Companycom currently has three p650 servers in their environment and they are implementing a p5 595. The p650 servers are running in an SMP environment, but are connected to a pair of HMCs. In order to follow best practices in the enterprise server environment and maintain HMC connectivity to the p650s, what else will needs to be ordered in addition to the p5 595?()

  • A、Include a new HMC in the order to connect to the p5 595
  • B、Include a pair of new HMCs in the order to connect to the p5 595
  • C、Include a media set for POWER5 HMC in the order to upgrade one of the existing HMC’s to POWER5 capabilities
  • D、Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC to  POWER5 capabilities Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC? To POWER5 capabilities

正确答案:B

第6题:

A customer is planning to migrate a financial application to a 12-way p5-570 system with 96GB of memory.  The application data is stored on an ESS Model 800 attached to a p670 server with AIX 5.2.  They will have a short outage window to perform the data migration.  What is the quickest way to move all the data stored on the attached ESS from the p670 to the new p5-570?()

  • A、Use rsync to synchronize the data across servers.
  • B、Use exportvg and importvg to move the data to the target system.
  • C、Use NFS to copy the data from the source system to the target system.
  • D、Backup the data from the source system and restore to the target system.

正确答案:B

第7题:

A customer requires an 8-way 16GB AIX system.  They are evaluating the following three systems: ? p5-570   ? p5-570 Express  ? p650   The pSeries technical specialist has been asked to explain the pros and cons of the three solutions.   What information will help the customer decide on the best solution for their environment?()

  • A、The p5-570 Express can support DDR2 memory.
  • B、The p650 and p5-570 Express provide faster processors.
  • C、The p5-570 Express is limited to eight 1.5GHz processors.
  • D、Neither the p5-570 nor the p5-570 Express supports Capacity on Demand.

正确答案:C

第8题:

Companycom is purchasing a p5 595 as part of a large server consolidation. They are planning on using micropartitioning and Virtual IO to consolidate small machines. They used the rPerf numbers for AIX 5.3 to size their solutions. They discovered that their application is not yet certified on AIX 5.3, so they will have to use AIX 5.2. What changes should be made to their configuration?()

  • A、Increase memory
  • B、Add more adapters
  • C、Increase both processors and adapters
  • D、Increase the number of processors by 20 - 30%

正确答案:C

第9题:

Companycom is migrating their application that was built on AIX 4.3, to a new p5 590 system that is running AIX 5.3. The application was a 32-bit program. What will need to be done with the application to allow it to run on the new system?()

  • A、Run without recompiling on AIX 5.3
  • B、Relink to the 32-bit kernel in order to run the application
  • C、Recompile to run on AIX 5.3 because the libraries are in different locations
  • D、Recompile 32-bit applications because the compiler flags and versions have changed

正确答案:A

第10题:

Companycom is planning on upgrading from a pSeries S85 running AIX 4.3.3 to a p5 570 with an HMC. The new server will run AIX 5L 5.2. What should be performed prior to the migration?()

  • A、Verify the ISV application runs on AIX 5.2
  • B、Power4 to POWER5 upgrades are not supported without a application recompile
  • C、Check the placement and size of the boot logical volume and disk space requirements on the S85
  • D、AIX 4.3.3 to AIX 5L 5.2 migrations are perfectly compatible so nothing needs to be checked

正确答案:A