A system must be upgraded from AIX 5.1 to 5.2. Which of the following scheduling processes should be performed? ()
第1题:
A.A logical volume must exist prior to running the crfs command to create a file system
B.A file system must be unmounted before it can be removed
C.Defining a file system imposes a structure on a logical volume
D.Removing a file system using rmfs automatically removes the underling logical volume
第2题:
Refer to the exhibit. Autonomous systems 200 and 300 have EBGP sessions established with their directly connected routers in au tonomous system 100. IGP has been configured on all routers in autonomous system 100 and they successfully exchange routing updates. Traffic originated in autonomous system 200 cannot reach the destination autonomous system 300. What configuration shoul d be done on the routers in autonomous system 100 in order for the traffic coming from autonomous system 200 to be forwarded to autonomous system 300?()
A. IBGP session must be established between routers R1 R2 and R2 R3, and the synchronization must be turned off.
B. IBGP speakers within autonomous 100 must be fully meshed, and the synchronization must be turned on.
C. IBGP session must be established between routers R1 R2 and R2 R3, and the synchronization must be turned on.
D. IBGP session mu st be established between routers R1 and R3, and the synchronization must be turned off.
E. IBGP speakers within autonomous 100 must be fully meshed, and the synchronization must be turned off.
F. IBGP session must be established between routers R1 and R3, and the synchronization must be turned on.
第3题:
The user must interact with the(73) in order to accomplish task.
A.printer
B.memory
C.CPU
D.operating system
第4题:
Which TWO of the following are required to use the hot-swap memory feature of the x445 while being operating system independent?()
第5题:
In order for combustion to occur inside a piping system such as a vapor collection header in a marine emmission control system, there must be ______.
A.fuel
B.oxygen
C.ignition
D.All of the above
第6题:
hich factors must be most considered when developing acceptance creteria?( )
A.Match with requirements B.User availability C.Ablity to benchmark system D.Schedule of system delivery
第7题:
You are planning to use a crude oil washing system.What precaution must be taken with the tank as the source for the washing machines ________.
A.It must be debottomed and the level lowered by at least one meter
B.The oil in the source tank must be sampled for compatibility
C.The source tank must have been crude oil washed at least once in the past 150 days
D.The inert gas system must lower the oxygen content to a maximum of 12% oxygen in the tank
第8题:
For any information system to serve its purpose,the information must be ( ) when it is needed.
A.integral
B.available
C.irreplaceable
D.confidential
第9题:
Which of the following statements is TRUE about the primary system dump device?()
第10题:
Prior to implementing an LPAR system, which of the following needs to be done?()