An administrator is planning to bring a newly purchased server online. Which of the following should the administrator do FIRST?()

  • A、Follow the pre-installation plan and procedures.
  • B、Review the system logs to check for errors.
  • C、Notify all users that the old system will be taken offline.
  • D、Apply all security updates to the system.
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Which of the following constitute Juran's "quality trilogy":

A . planning, inspection, control.

B . planning, improvement, control.

C . planning, organization, control.

D . product, price, customer.

E . design, build, deliver.


正确答案:B

第2题:

123 Which of the following constitute Juran's "quality trilogy":

A. planning, inspection, control.

B. planning, improvement, control.

C. planning, organization, control.

D. product, price, customer.

E. design, build, deliver.


正确答案:B

第3题:

Project management/project planning is most closely aligned with:

A.Long range/strategic planning ( years or more).

B.Intermediate range planning ( to years)

C.Short range/tactical planning ( year or less).

D.All of the above.

E.B and C.


正确答案:E

E

第4题:

ideally, lesson planning should be done at two levels: _______________.

A. before-class planning and after-class planning

B. before-class preparation and after-class feedback

C. before-class planning and after-class reflection

D. macro planning and micro planning


正确答案是:D

第5题:

MRPII指的是:()

A.material requirement planning。

B.management requirement planning。

C.manufacturing resource planning。

D.material revenue planning。

E.Material risk planning。


正确答案:C

第6题:

121 Project management/project planning is most closely aligned with:

A. Long range/strategic planning (5 years or more).

B. Intermediate range planning (1 to 5 years)

C. Short range/tactical planning (1 year or less).

D. All of the above.

E. B and C


正确答案:E

第7题:

116 Planning activities such that predetermined resource availability pools are not exceeded is called: A. Resource leveling.

B. Manpower leveling.

C. Resource limited planning.

D. Manpower planning.

E. Manpower contingency planning.


正确答案:C

第8题:

Planning activities such that predetermined resource availability pools are not exceeded is called:

A.Resource leveling.

B.Manpower leveling.

C.Resource limited planning.

D.Manpower planning.

E.Manpower contingency planning.


正确答案:C
C

第9题:

Lesson planning should be done at two levels: _____.

A.macro planning and micro planning

B.day by day and one week


参考答案:A

第10题:

The project life-cycle can be described as().

A.project concept, project planning, project execution, and project close-out
B.project planning, work authorization, and project reporting
C.project planning, project control, project definition, WBS development, and project termination
D.project concept, project execution, and project reporting

答案:A
解析:
关于项目周期划分正确的是(72)。

A. 启动、计划、执行、收尾

B. 计划、授权、报告

C. 计划、控制、方案设计、WBS的发展、终止

D. 启动、执行、报告