Having been familiar with his ability, ().A、the manager was assigned a challenging taskB、the manager assign a challenging taskC、the board assigned him a challenging taskD、a challenging task was assigned to the manager

题目

Having been familiar with his ability, ().

  • A、the manager was assigned a challenging task
  • B、the manager assign a challenging task
  • C、the board assigned him a challenging task
  • D、a challenging task was assigned to the manager
参考答案和解析
正确答案:C
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

In a matrix organizational form, which factor(s) make it difficult for a project manager to provide a valid input into the employee's performance review?

A . Not working directly with the assigned functional employees

B . Employees spend only a short amount of time assigned to the project

C . Not being knowledgeable enough to evaluate employees on technical judgment

D . All of the above

E . A and B only


正确答案:D

第2题:

22 In a matrix organizational form, which factor(s) make it difficult for a project manager to provide a valid input into the employee's performance review?

A. Not working directly with the assigned functional employees

B. Employees spend only a short amount of time assigned to the project

C. Not being knowledgeable enough to evaluate employees on technical judgment

D. All of the above

E. A and B only


正确答案:D

第3题:

The scope of a project can be expected to change if:

A.The project manager must provide cost estimates without having a design concept

B.Oversimplification (underestimating) of the nature of the work occurs

C.The project manager is assigned after the project is defined, and the cost and schedule are approved

D.A clear objective is not provided

E.All of the above are possible based upon the situation


正确答案:E

第4题:

● A Gantt chart is useful in determining:

A the level of effort for a task

B when a task starts and stops

C how tasks are related to each other

D who is assigned to do a task

E All of the above.


正确答案:B

第5题:

123 The scope of a project can be expected to change if:

A. The project manager must provide cost estimates without having a design concept B. Oversimplification (underestimating) of the nature of the work occurs

C. The project manager is assigned after the project is defined, and the cost and schedule are approved D. A clear objective is not provided

E. All of the above are possible based upon the situation


正确答案:E

第6题:

20 A Gantt chart is useful in determining:

A. the level of effort for a task

B when a task starts and stops

C. how tasks are related to each other

D. who is assigned to do a task

E. All of the above


正确答案:B

第7题:

41 The scope of a project can be expected to change if:

A. The project manager must provide cost estimates without having a design concept B. Oversimplification (underestimating) of the nature of the work occurs

C. The project manager is assigned after the project is defined, and the cost and schedule are approved

D. A clear objective is not provided

E. All of the above are possible based upon the situation


正确答案:E

第8题:

A Gantt chart is useful in determining:

A.the level of effort for a task

B.when a task starts and stops

C.how tasks are related to each other

D.who is assigned to do a task

E.All of the above.


正确答案:B
B

第9题:

● The scope of a project can be expected to change if:

A The project manager must provide cost estimates without having a design concept

B Oversimplification (underestimating) of the nature of the work occurs

C The project manager is assigned after the project is defined, and the cost and schedule are approved

D A clear objective is not provided

E All of the above are possible based upon the situation


正确答案:E

第10题:

The work is challenging, and you need a university degree to work there.()

此题为判断题(对,错)。


参考答案:错

更多相关问题