Using Oracle Scheduler you have scheduled two jobs, JOB_A and JOB_B, to run at 9:00 p.m. every Friday. You want both the jobs to use a single resource plan, WEEKEND_PLAN. Which task must have already been performed to enable you to achieve this objective?()
第1题:
A. setting idle timeout limits on resource plans
B. saving storage space by using compressed backup sets
C. creating jobs that will run automatically at a scheduled time
D. assigning priorities to jobs to manage access to system resources
E. creating alerts to perform notification when tablespaces are low on available space resources
第2题:
You create two resource plans, one for data warehouse loading jobs at night and the other for application jobs at day time. You want the resource plans to activate automatically so that the resource allocation is optimum as desired by the activity.How would you achieve this?()
第3题:
A. setting idle timeout limits on resource plans
B. saving storage space by using compressed backup sets
C. creating jobs that will run automatically at a scheduled time
D. assigning priorities to jobs to manage access to system resources
E. creating alerts to perform notification when tablespaces are low on available space resources
第4题:
For which two situations would you use functionality provided by the Resource Manager? ()(Choose two.)
第5题:
You work as a database administrator for Supportcenter.cn. You want to administer your database servers, which are running on different host machines, using the Web-enabled grid control interface. You have configured the agent on the host machines. You have started the Oracle Database 10g Grid Control utility on your machine. Which two additional components would you configure to achieve this objective?()
第6题:
In your production database there is a job, CALC_STAT, which has been scheduled to run every Friday at 5:00 p.m. CALC_STAT updates the optimizer statistics for the objects owned by the APPS schema. You want the task to be generic, thereby allowing users to modify the attributes of the task at run time without affecting the original task. Which component of Oracle Scheduler must you define to achieve this?()
第7题:
You have not configured Oracle Managed Files (OMF) in your database. You do not want to scan the entire datafile every time an incremental backup is performed. You decide to enable the block change tracking feature. Which statement will you use to enable the block change tracking feature?()
第8题:
You have not configured Oracle Managed Files (OMF) in your database. You do not want to scan the entire datafile every time an incremental backup is performed. You decide to enable the block change tracking feature. Which statement should you use to enable the block change tracking feature?()
A. ALTER DATABASE ENABLE BLOCK CHANGE TRACKING;
B. ALTER SYSTEM ENABLE BLOCK CHANGE TRACKING USING FILE <path>;
C. ALTER DATABASE ENABLE BLOCK CHANGE TRACKING USING FILE <path>;
D. ALTER SYSTEM ENABLE BLOCK CHANGE TRACKING;
第9题:
Using Oracle Scheduler you have scheduled two jobs, JOB_Aand JOB_B, to run at 9:00 p.m. every Friday. You want both the jobs to use a single resource plan, WEEKEND_PLAN. Which task must have already been performed to enable you to achieve this objective?()
第10题:
For which two situations would you use functionality provided by the Resource Manager?()