Create a custom event script to perform the change to CPU entitlement
Modify the extended performance tuning parameters for the cluster to modify CPU entitlement uponresource group acquisition
Customize the resource group attributes of RG1 so that the CPU entitlement is modified for Node2 uponresource group acquisition
Customize the application server attributes of APP1 so that the CPU entitlement is modified for Node2upon resource group acquisition
第1题:
An administrator is installing PowerHA filesets, and this cluster will be cross-mounting filesystems using NFSversion 4. Which additional fileset is required?()
第2题:
An administrator wants to install Web SMIT on a node that is not part of a cluster. Which PowerHA filesetprovides this function?()
第3题:
An active PowerHA cluster was shutdown from C-SPOC with the "Unmanage Resource Groups" option. Afterthe operation successfully completes, what is the internal state of the cluster manager as shown by the lssrc -ls clstrmgrES command?()
第4题:
An architect is configuring a PowerHA cluster in the following way:The cluster will consist of two nodes. Each node will have two boot interfaces configured as a single PowerHA network. The cluster is to have asingle resource group with a single service address.Heartbeating over aliased is not to be used. What is the minimum number of subnets required to implement this cluster?()
第5题:
An administrator has a 2 node cluster running PowerHA version 5.5. They remove a resource group from theactive cluster configuration. When performing a verify and synchronize of the cluster, the administrator getsthe following error: "migcheck[471]: cl_connect() error, nodename=Node1, rc=-1 cldare: A communication error prevents obtaining the VRMF from remote nodes. A DARE event cannot be run until this is corrected. Please ensureclcomd is running." What is the most likely cause of this error?()
第6题:
In which file can the administrator view the detailed results of the overnight cluster automatic verification?()
第7题:
An administrator is configuring a new cluster and has a requirement for a notification to be generated if the /tmp File System becomes greater than 90% full. Which of the following PowerHA components will support theadministrator’s requirement?()
第8题:
A client wants to implement a highly available cluster between two sites. At each site the client has an IBMDS8300. At each site, the client would like a single node which will be connected through a SAN to the local DS8300but not the remote DS8300. Which clustering product could be used to provide high availability for this infrastructure?()
第9题:
An administrator will be performing a PowerHA upgrade on a cluster from version 5.3 to version 5.5. Which ofthe following tasks will verify a successful migration?()
第10题:
An administrator is planning for a six node cluster but is concerned about the administration needed tomanage user accounts throughout the cluster. What PowerHA feature could the administrator use to reducethe administration overhead?()