POWER4
POWER5
POWER6
POWER5+
第1题:
A.1
B.2
C.3
D.4
第2题:
A. document power and UPS availability
B. to integrate routing and switching components
C. create a design specification document
D. document the customer‘s current and future technology projects
第3题:
A.Push the power button for a minimum of 6 seconds, then release
B.Push the power button for a minimum of 8 seconds, then release
C.Push the power button for a minimum of 4 seconds, then release
D.Push the power button for a minimum of 2 seconds, then release
第4题:
Before installing a new, upgraded version of the IOS, what should be checked on the router, and which command should be used to gather this information?()
第5题:
What are two step needed to define a QoS policy for a traffic class?()
第6题:
A.PowerHA Standard Edition
B.PowerVM Standard Edition
C.Power6 Management Edition
D.Power6 Virtualization Edition
第7题:
What is a primary objective of the security architecture assessment? ()
第8题:
A. Computer will not POST
B. Computer will overheat
C. Monitor will not power on
D. Processor will not run at proper speed
第9题:
What is meant by the term "firewall sandwich"?()
第10题:
When a power supply does not meet minimum requirements for a motherboard, which of thefollowing can happen?()