A power module has failed and there is not enough power to see video on all blades.
MUX 3 on theBladeCenter backplane has failed.
A firmware update is required on the AMM.
A second AMM is required to view video on blades 9-14.
第1题:
A customer is interested in reducing energy consumption and infrastructure consolidation for space. The customer needs a maximum of 14 servers in 7U rack. Which IBM BladeCenter Chassis should be recommended? ()
第2题:
A customer is interested in a power efficient server solution. The Sales Specialist has recommended a BladeCenter solution. The customer debates the price is high compared to rack servers. Which of the following should the Sales Specialist emphasize to address the pricing difference?()
第3题:
A banking customer orders three IBM BladeCenter E chassis and thirty-four HS22 blades. Theustomer wants to fully populate the chassis with blades where possible. Which of the following is the minimum number of power cables required to provide redundancy? ()
第4题:
A medical customer wants to deploy around 8TB integrated storage on a BladeCenter.Which of the following should be discussed with this customer?()
第5题:
A customers has asked you to investigate their current x86 server environment to determinate if they can achieve a reduction in power and rack consumption. They plan to implement VMware and the local storage shared. Which of the following consolidation proposals meets these needs?()
第6题:
A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information, what additional items does the customer need to purchase? ()
第7题:
A customer has purchased an IBM BladeCenter H chassis and needs the following servers: --Two HS21 blade servers each with 8GB memory and 2 drives --Two HS21 blade servers each with 24GB memory and 2 drives --Two LS21 blade servers each with 2GB memory and 2 Hot-Swap SCSI drives How many total server bays will be required for this configuration?()
第8题:
JS12 刀片是否可以兼容BladeCenter S、BladeCenter T、BladeCenter H、BladeCenter E刀片中心?()
第9题:
A Sales Specialist receives an email from a customer, requesting information on IBM’s best Server Consolidation solution. How should the Sales Specialist proceed? ()
第10题:
A manufacturing customer wants a consolidation solution that provides scale-out capability and the highest processor density per rack unit. Which of the following solution meets customer’s requirement?()