It will display a list of files that need incremental backup.
It will display a list of files that need backup after five days.
It will display a list of files that were backed up in the last five days.
It will display a list of files that have not been backed up in the last five days.
It will apply the current retention policy to determine the files that need to be backed up.
第1题:
In which scenario, will you issue the following command?() RMAN> REPORT NEED BACKUP DAYS 7;
第2题:
Your PROD database has been started using the server parameter file. In your PROD database you are using RMAN for backup and recovery operations. You issue the following commands from the RMAN prompt: RMAN> CONFIGURE CONTROLFILE AUTOBACKUP OFF; RMAN> BACKUP DATABASE; Which files from the database will be backed up as a result of this BACKUP command?()
第3题:
Multiple RMAN sessions are connected to the database instance.Examine the following output when backup commands are running in server sessions:What could have helped you to correlate server sessions with channels?()
A. Implement RMAN multiplexing
B. Set the DEBUG ON in the RMAN script
C. Specify the command ID in the RMAN script
D. Use a tag with the RMAN BACKUP command
第4题:
You want to implement the backup and recovery strategy in your database using Recovery Manager (RMAN). You have chosen the control file of the target database for the RMAN repository. Which command-line RMAN command would you use to establish a local connection between RMAN and the RMAN repository if your database is using password file authentication?()
第5题:
Your database is running in the ARCHIVELOG mode. You have configured RMAN for backup and recovery operations. You execute the following command from the RMAN prompt: RMAN> CONFIGURE CONTROLFILE AUTOBACKUP ON; After executing this command, in which of the following cases will RMAN make an auto-backup of the control file? ()
第6题:
How would you grant the RVPC user access to specific RMAN database records in the RMAN virtual private catalog?()
第7题:
Consider the following scenario for your database: - Backup optimization is enabled in RMAN. - The recovery window is set to 7 days in RMAN. - The most recent backup to disk for the TOOLS tablespace was taken on November 3, 2007. - The TOOLS tablespace is read-only since November 4, 2007. On November 23, 2007, you issue the RMAN command to back up the database to disk. Which statement is true regarding the backup of the TOOLS tablespace?()
第8题:
View the Exhibit to examine the error during the database startup.You open an RMAN session for the database instance. To repair the failure, you executed the following as the first command in the RMAN session:RMAN> REPAIR FAILURE;Which statement describes the consequence of the command?()
A. The command performs the recovery and closes the failures.
B. The command only displays the advice and the RMAN script required for repair.
C. The command produces an error because the ADVISE FAILURE command has not been executed before the REPAIR FAILURE command.
D. The command executes the RMAN script to repair the failure and removes the entry from the Automatic Diagnostic Repository (ADR).
第9题:
You are maintaining the PROD database for NetFx Corporation. You have configured controlfile autobackup in your database. At 6:00 P.M. on Monday, you issue the following command: RMAN>BACKUP DATABASE; At 8:00 A.M. on Tuesday, you are unable to start the database because all the control files are missing. You decide to restore the control files from the backup by using the RMAN> RESTORE CONTROLFILE FROM AUTOBACKUP; command. Which operation should you perform before using the RMAN> RESTORE CONTROLFILE FROM AUTOBACKUP; command?()
第10题:
You issue the following command on the RMAN prompt. RMAN> REPORT NEED BACKUP DAYS = 5 DATABASE; Which statement is true about executing this command?()