1 year 7x24
3 years 7x24
1 year 9-5 M-F
3 years 9-5 M-F
第1题:
A customer recently purchased an HS22 Blade to install into their existing BCH chassis. The customer installed the blade and it was not recognized. Which ofthe following is the first question for this customer?()
第2题:
A customer has purchased a triple channel memory kit containing three DDR3 RAM modules. Theserver the RAM is intended for only has a dual channel capable motherboard. Which of the following is the BEST action to perform?()
第3题:
Due to slow response times, a customer purchased additional memory. After the memory was installed,response time was not improved. They complained to the pSeries technical specialist. Which of the following questions should be asked of this customer?()
第4题:
Customer purchased and x3650 M3 server and requires the ability to remotely power on and off the server. What if any additional hardware would the customer need to purchase to remotely power the server on and off?()
第5题:
A customer has purchased three IBM System Storage DS8300 systems and would like to have their SAN and storage administrator trained. The customer is worried about having much of their staff out of the office at the same time attending courses. Which training alternative provides the necessary training with the least impact()
第6题:
A user has purchased a laptop that has no means to charge the battery. Which of the followingwould the user MOST likely purchase?()
第7题:
A customer is very concerned about maintaining a competitive advantage through the use of state-of-the-art technology. Assuming all solutions meet the customer’s technical requirements, which solution should the IBM team propose to maximize customer satisfaction?()
第8题:
A current Sun Solaris customer has just purchased their first p5 590. During the Solution Assurance, the backup requirements were discussed. Which of the following should be recommended to the customer with regards to restoring rootvg?()
第9题:
Companycom is currently using a p690 and has just ordered a p5 590. They prefer to run in full system partition mode, since their application will utilize all the resources in the machine, and they don't want the overhead of an LPAR. What is the best response to the customer about the POWER5 capabilities?()
第10题:
A customer has been working with your company to purchase an iDataPlex cluster. They have a configuration from IBM and are getting ready to place an order. Which should be done of the following?()