Terminate the back end of the chain.
Set the jumper to device ID 0.
Terminate both ends of the chain.
Set the jumper to cable select.
第1题:
A. Terminate the back end of the chain.
B. Set the jumper to device ID 0.
C. Terminate both ends of the chain.
D. Set the jumper to cable select.
第2题:
When installing processors with mixed stepping levels in a server, which of the following guidelines must be followed? ()
第3题:
A.When compile, some error will occur.
B.When run, some error will occur.
C.Output is zero.
D.Output is null.
第4题:
When installing a wireless network in a large area, which of the following is the FIRST thing thatshould be considered when trying to get the MOST coverage?()
第5题:
Which of the following settings is the jumper set to when installing a DVD-RW as the second deviceon an IDE cable?()
第6题:
A.alog
B.telinit
C.sysinit
D.cfgmgr
第7题:
When installing external SCSI devices, terminators are required on:()
第8题:
A. Thermal paste
B. Fans
C. Drive speeds
D. Cable management
第9题:
Which of the following must occur when installing SCSI devices into the server?()
第10题:
Which of the following is MOST critical when installing a new processor in an existing system?()