Company.com wants to change the resource allocation for thei

题目
单选题
Company.com wants to change the resource allocation for their AIX 5L V5.3 micro LPAR system. What is the smallest processor allocation than can be moved between partitions?()
A

A full processor

B

1% of a processor

C

10% of a processor

D

25% of a processor

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

178 Assigning resources in an attempt to find the shortest project schedule consistent with fixed resource limits is called resource _____.

A. Allocation.

B. Partitioning

C. Leveling

D. Quantification.

E. None of above.


正确答案:A

第2题:

Which three statements are true about windows?()

A. Only one window can be open at any given time

B. Consumer groups are associated with windows

C. Windows work with job classes to control resource allocation

D. The database service name must be provided during windows creation

E. Windows can automatically start job or change resource allocation among jobs for various time periods.


参考答案:A, C, E

第3题:

Assigning resources in an attempt to find the shortest project schedule consistent with fixed resource limits is called resource _____.

A.Allocation.

B.Partitioning

C.Leveling

D.Quantification.

E.None of above.


正确答案:A
A

第4题:

为了实现跨基站小区之间的负荷均衡,eNB可以通过()协议消息,协商切换参数。

  • A、RESOURCE STATUS REQUEST和RESOURCE STATUS RESPONSE
  • B、MOBILITY CHANGE REQUEST和MOBILITY CHANGE ACKNOWLEDGE
  • C、HANDOVER REPORT
  • D、LOAD INFORMATION

正确答案:B

第5题:

● Your project is behind schedule due to conflict between team members. Having resolved the conflict, to get the project back on schedule, you should consider __(74)__.

(74)A.crashing the schedule

B.performing resource leveling

C.conducting reverse resource allocation scheduling

D.utilizing the critical chair resources


正确答案:D
你的项目由于团队成员之间的冲突而导致进度滞后了,为了解决这种冲突,让项目回到计划进度上来,你应该考虑的是利用临界(应急)资源。

第6题:

Resource allocation资源配置


参考答案:

将资源(生产要素)在各种潜在用途上进行分配,以生产出一组特定的最终产品的经济方式。


第7题:

Which three statements are true about windows? ()(Choose three.)

A. Only one window can be open at any given time

B. Consumer groups are associated with windows

C. Windows work with job classes to control resource allocation

D. The database service name must be provided during windows creation

E. Windows can automatically start job or change resource allocation among jobs for various time periods.


参考答案:A, C, E

第8题:

Smoothing out resource requirements from period to period is called resource _____.

A.Allocation.

B.Partitioning

C.Leveling.

D.Quantification

E.None of above.


正确答案:C
C

第9题:

Your project is behind schedule due to conflict between team members. Having resolved the conflict, to get the project back on schedule, you should consider __(74)__.

A.crashing the schedule

B.performing resource leveling

C.conducting reverse resource allocation scheduling

D.utilizing the critical chair resources


正确答案:D
你的项目由于团队成员之间的冲突而导致进度滞后了,为了解决这种冲突,让项目回到计划进度上来,你应该考虑的是利用临界(应急)资源。

第10题:

Your project is behind schedule due to conflict between team members . Havingresolved the conflict, to get the project back on schedule , you should consider ().

  • A、crashing the schedule
  • B、performing resource leveling
  • C、conducting reverse resource allocation scheduling
  • D、utilizing the critical chain resources

正确答案:A

更多相关问题