fixed-size
dynamically expanding
pass-through
differencing
第1题:
You plan to implement a Hyper-V host cluster. The cluster will contain two servers connected to a Storage Area Network (SAN). You need to recommend a storage location for virtual machine (VM) snapshots. The solution must ensure that the VMs can fail over. Which storage location should you recommend?()
第2题:
You create two resource plans, one for data warehouse loading jobs at night and the other for application jobs at day time. You want the resource plans to activate automatically so that the resource allocation is optimum as desired by the activity.How would you achieve this?()
第3题:
When you create a network implementation VLAN solution, what is one procedure that you should include in your plan?()
第4题:
You have a two-node Hyper-V failover cluster that uses SAN storage. You are designing storage for a new virtualization environment by using Windows Server 2008 R2. You plan to deploy five virtual machines (VMs) per logical unit number (LUN). You need to be able to perform a live migration of a single VM while the other VMs continue to run on the host server. What should you do?()
第5题:
You configure a Windows Server 2008 R2 Hyper-V server with several virtual machines (VMs). A software vendor releases a software update for an application that runs on only one of the VMs. You need to plan a strategy that enables you to install and test the update without interrupting business operations and without corrupting data. What should you do first?()
第6题:
Which of the following is the NEXT step in the troubleshooting theory after identifying the problem?()
第7题:
Your virtual environment includes Windows Server 2008 R2 Hyper-V servers. You manage the environment by using Microsoft System Center Virtual Machine Manager (VMM) 2008 R2. You are planning to install an application upgrade. Testing the production application requires access to the following three virtual machines (VMs): a domain controller, a server that runs Microsoft SQL Server, and an IIS Web server. You need to test the application upgrade in a virtual environment that is isolated from the production network. Which two sets of actions should your plan include?()
第8题:
Which implement phase service component consists of preparing for migration,excuting a network migration plan,and completing migration test cases?()
第9题:
You plan to implement Hyper-V live migration. You configure the Hyper-V hosts to connect to a shared storage. You need to prepare the Hyper-V hosts for the implementation of live migration. What should you configure on the Hyper-V hosts?()
第10题:
You plan to deploy a Hyper-V host that runs Windows Server 2008 R2 Service Pack 1 (SP1). You need to recommend a solution for the virtual machines (VMs) on the Hyper-V host. The solution must meet the following requirements: - The VMs must not increase beyond their original size. - The VMs must be backed up by using a host-based backup. What should you include in the recommendation?()