IBM pSeries servers support Oracle on both POWER4 and Itanium
AIX has Itanium affinity with any ISV application including Oracle
Oracle and thousands of other ISV applications are already available for AIX on pSeries
IBM Data Migration Services can migrate the HP UNIX operating system to a pSeries solution
第1题:
HP-UNIX强制时钟同步的命令是: ntpdate -b [server],如:ntpdate -b bep1。
第2题:
A healthcare customer has an IBM System i server and an HP-UX server. They have high performance I/O, image-based, and archival applications. The customer has asked the IBM team for guidance on IBM DS8000 disk technologies. Which DS8000 disk technology would provide the best performance without regard to cost to meet the customer requirement()
第3题:
Integration between ()with "multi data sources" and() is defined as Gridlink for RAC (Real Application Clusters)
第4题:
A customer is running a number of HP Intel servers within an IBM management environment. The HP Insight Manager agent is already installed, but they do not want to install the Director agent because of potential conflicts. Into which system are the MIB files compiled?()
第5题:
A customer wants to boot from an iSCSI SAN with their IBM BladeCenter infrastructure running Microsoft Windows Server 2000. What is required for the customer to be able to perform this?()
第6题:
A major account is considering migrating from a proprietary Unix server to a Linux and Intel-based platform. They are not sure if the Intel-based server will be able to handle the workload of the Unix server. What would be the best strategy to win with an IBM solution?()
第7题:
A customer wishes to replace 12 older small UNIX systems. They are running out of floor space in their data center and any solution must take this into consideration. Assuming that the applications are supported on all AIX versions, which of the following would best meet the customer’s requirements?()
第8题:
While discussing the customer’s environment the storage specialist discovers that the customerhas both Windows and UNIX servers running various applications. The customer is looking for acost effective 10 TB solution that includes a mirrored site to meet their Disaster Recovery plan.Which of the following solutions should be recommended?()
第9题:
A customer has four 2-way 2U front-end web servers that are currently running at 15% CPU utilization. These servers provide points of access for users worldwide, and volume is expected to triple in the next six months and aggressively grow thereafter. They want to upgrade these systems to newer technology and stay within the 8U of rack space that they are replacing. Which solution would fit the customer’s requirements?()
第10题:
A customer is looking at an Oracle eBusiness solution. They would like to know what hardware they will need for the solution. They have some preliminary information from Oracle, including hardware requirements and specifics for their environment. Which of the following should be done next?()