Which of the following resources are created in the WebSpher

题目
多选题
Which of the following resources are created in the WebSphere Application Server configuration when a WebSphere Commerce V5.6 instance is created?()
A

DataSource

B

Virtual Hosts

C

Server Group

D

The selected JDBC Driver

E

Remote Servlet Redirector

参考答案和解析
正确答案: C,B
解析: 暂无解析
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Which of the following resources can be explicitly locked?()

A.Row

B.Page

C.Table

D.Column


参考答案:C

第2题:

Which of the following is TRUE when creating a file system that resides on the center of a disk?()

A.The logical volume is created first.

B.The physical volume will be automatically created.

C.The physical partition must be specified as an option.

D.The file system will be mounted during the time of creation.


参考答案:A

第3题:

Forecasting human resource requirements necessitates making predictions about both the supply and demand of human resources. Which of the following is not a method used to forecast the demand for human resources?

A . Delphi Method

B . Regression Analysis

C . PERT Charts

D . Staffing Tables

E . Time Series Analysis


正确答案:C

第4题:

Which of the following is being described when using a single physical server to host multiple logical servers to more effectively utilize hardware resources?()

  • A、Application virtualization
  • B、Multicore processing
  • C、Server virtualization
  • D、Hyper threading

正确答案:C

第5题:

Which of the following is TRUE when creating a file system that resides on the center of a disk?()

  • A、The logical volume is created first.
  • B、The physical volume will be automatically created.
  • C、The physical partition must be specified as an option.
  • D、The file system will be mounted during the time of creation.

正确答案:A

第6题:

A trigger can be created on which of the following objects?()

A.View

B.Catalog Table

C.Stored Procedure

D.Global Temporary Table


参考答案:A

第7题:

In IPCCX, skills can be assigned to which of the following configuration objects?()

  • A、resources  
  • B、Skill Groups  
  • C、competence levels  
  • D、Resource Groups

正确答案:A

第8题:

143 Forecasting human resource requirements necessitates making predictions about both the supply and demand of human resources. Which of the following is not a method used to forecast the demand for human resources?

A. Delphi Method

B. Regression Analysis

C. PERT Charts

D. Staffing Tables

E. Time Series Analysis


正确答案:C

第9题:

A group of users report that they can access local resources but cannot access the Internet. Which of the following should the administrator use to test connectivity?()

  • A、 tracert
  • B、 msconfig
  • C、 route
  • D、 net use

正确答案:A

第10题:

Which of the following BEST describes a server where several physical server chassis are housed within an enclosure to share some redundant resources?()

  • A、Tower server
  • B、Rack mount server
  • C、Blade server
  • D、Bare metal server

正确答案:C

更多相关问题