During which boot phase is the rootvg first activated()

题目
单选题
During which boot phase is the rootvg first activated()
A

Phase 1

B

Phase 2

C

Phase 3

D

POST Phase

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

After mirroring rootvg, a system administrator wants to validate that the system will boot correctly.Which of the following tasks must be performed before changing the boot order?()

A.Run a bosboot -a command

B.Mirror the hd5 on the two disks

C.Set up another service mode bootlist

D.Check the disks using a lsvg -p rootvg command


参考答案:C

第2题:

The purpose of the systems analysis phase is to build a logical model of the new system.The first step is(71),where you investigate business processes and document what the new system must do to satisfy users. This step continues the investigation that began during the(72). You use the fact-finding results to build business models,data and process models,and object models. The deliverable for the systems analysis phase is the(73),which describes management and user requirements,costs and benefits,and outlines alternative development strategies.The purpose of the systems design phase is to create a physical model that will satisfy all documented requirements for the system. During the systems design phase,you need to determine the(74),which programmers will use to transform the logical design into program modules and code. The deliverable for this phase is the(75),which is presented to management and users for review and approval.

A.system charter
B.system scope definition
C.system blueprint
D.system requirements document

答案:B
解析:
翻译:系统分析阶段的目的是建立新系统的逻辑模型,第一步就是进行(71),调查业务流程并记录新系统必须做哪些以满足用户需求。这一步是(72)的延续,可以使用调查结果构建业务模型,数据和流程模型以及对象模型。系统分析阶段的可交付成果是(73),它描述了管理和用户要求,成本和收益,还有可替代的方案。系统设计阶段的目的是创建一个能够满足系统所有需求文件要求的物理模型。 在系统设计阶段,需要确定(74),程序员通过系统过程模型把逻辑设计转换为程序模块和代码。该阶段的可交付成果是(75),提交给管理层和用户审查和批准。(73) A.系统章程B.系统范围定义C.系统蓝图 D.系统需求文件
参考答案:(73)B

第3题:

Typically, during which phase in a project life cycle are most of the project expenses incurred.

A . Concept phase

B . Development of design phase

C . Execution phase.

D . Termination phase.

E . None of the above


正确答案:C

第4题:

Which of the following could cause an Inaccessible boot drive error during the boot process? ()

  • A、HDD failure
  • B、DVI failure
  • C、USB failure
  • D、CD failure

正确答案:A

第5题:

The purpose of the systems analysis phase is to build a logical model of the new system.The first step is(71),where you investigate business processes and document what the new system must do to satisfy users. This step continues the investigation that began during the(72). You use the fact-finding results to build business models,data and process models,and object models. The deliverable for the systems analysis phase is the(73),which describes management and user requirements,costs and benefits,and outlines alternative development strategies.The purpose of the systems design phase is to create a physical model that will satisfy all documented requirements for the system. During the systems design phase,you need to determine the(74),which programmers will use to transform the logical design into program modules and code. The deliverable for this phase is the(75),which is presented to management and users for review and approval.

A.system architecture description
B.system design specification
C.system technique architecture
D.physical deployment architecture

答案:B
解析:
翻译:系统分析阶段的目的是建立新系统的逻辑模型,第一步就是进行(71),调查业务流程并记录新系统必须做哪些以满足用户需求。这一步是(72)的延续,可以使用调查结果构建业务模型,数据和流程模型以及对象模型。系统分析阶段的可交付成果是(73),它描述了管理和用户要求,成本和收益,还有可替代的方案。系统设计阶段的目的是创建一个能够满足系统所有需求文件要求的物理模型。 在系统设计阶段,需要确定(74),程序员通过系统过程模型把逻辑设计转换为程序模块和代码。该阶段的可交付成果是(75),提交给管理层和用户审查和批准。(75) A.应用程序架构 B.系统设计规格说明书C.系统技术架构 D.系统部署架构参考答案:(75)B

第6题:

During which phase is a proposal developed and delivered? ()

A.Prepare

B.Plan

C.Design

D.Operate


参考答案:A

第7题:

The purpose of the systems analysis phase is to build a logical model of the new system.The first step is(71),where you investigate business processes and document what the new system must do to satisfy users. This step continues the investigation that began during the(72). You use the fact-finding results to build business models,data and process models,and object models. The deliverable for the systems analysis phase is the(73),which describes management and user requirements,costs and benefits,and outlines alternative development strategies.The purpose of the systems design phase is to create a physical model that will satisfy all documented requirements for the system. During the systems design phase,you need to determine the(74),which programmers will use to transform the logical design into program modules and code. The deliverable for this phase is the(75),which is presented to management and users for review and approval.

A.systems planning phase
B.systems modeling phase
C.systems analysis phase
D.systems design phase

答案:A
解析:
翻译:系统分析阶段的目的是建立新系统的逻辑模型,第一步就是进行(71),调查业务流程并记录新系统必须做哪些以满足用户需求。这一步是(72)的延续,可以使用调查结果构建业务模型,数据和流程模型以及对象模型。系统分析阶段的可交付成果是(73),它描述了管理和用户要求,成本和收益,还有可替代的方案。系统设计阶段的目的是创建一个能够满足系统所有需求文件要求的物理模型。 在系统设计阶段,需要确定(74),程序员通过系统过程模型把逻辑设计转换为程序模块和代码。该阶段的可交付成果是(75),提交给管理层和用户审查和批准。(72) A.系统计划阶段B.系统建模阶段C.系统分析阶段 D.系统设计阶段
参考答案:(72)A

第8题:

6 Typically, during which phase in a project life cycle are most of the project expenses incurred. A. Concept phase

B Development of design phase

C. Execution phase.

D. Termination phase.

E. None of the above


正确答案:C

第9题:

A current Sun Solaris customer has just purchased their first p5 590. During the Solution Assurance, the backup requirements were discussed. Which of the following should be recommended to the customer with regards to restoring rootvg?()

  • A、mksysb
  • B、restvg
  • C、AIX install CDs
  • D、Veritas NetBackup

正确答案:A

第10题:

During system boot, rootvg fails to vary on, causing an LED code of 0552. What is the most likely cause for rootvg not varying on?()

  • A、Missing blv
  • B、Network problem
  • C、Wrong boot table
  • D、Corrupted file system

正确答案:D