Which of the following steps are necessary in order to add a

题目
多选题
Which of the following steps are necessary in order to add a new VLAN to a switched network?()
A

Create the VLAN.

B

Name the VLAN.

C

Configure an IP address for the VLAN.

D

Add the desired ports to the new VLAN.

E

Add the VLAN to the VTP domain.

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Please take the necessary steps()delay.


正确答案:without

第2题:

Which of the following ALTER DISKGROUP commands does not use V$ASM_OPERATION to record thestatus of the operation?()

  • A、ADD DIRECTORY
  • B、DROP DISK
  • C、RESIZE DISK
  • D、REBALANCE
  • E、ADD FAILGROUP

正确答案:A

第3题:

Which of the following steps are necessary in order to add a new VLAN to the Ezonexam switched network? (Select all that apply)

A.Create the VLAN.

B.Name the VLAN.

C.Configure an IP address for the VLAN.

D.Add the desired ports to the new VLAN.

E.Add the VLAN to the VTP domain.


正确答案:ABD
解析:Explanation:
The following are the basic requirements for creating VLANs:
* Creating the VLAN numbers and names
* Configuring each port's assigned VLAN

Incorrect Answers:
C. This is an optional feature, but not a necessary step for creating a VLAN.

E. Adding any VLAN to a Virtual Trunking Protocol (VTP) domain may be desired in a complex multi-switch and multi-VLAN network. However, it is not a necessary step for creating stand-alone VLANs on a single switch.

第4题:

A server is experiencing an undetermined problem. Which of the following steps should the technician take in order to identify whether it is a software or hardware problem?()

  • A、Reseat all main components
  • B、Try to replicate the problem
  • C、Flash the BIOS
  • D、Reinstall the operating system

正确答案:B

第5题:

Which of the following step libraries is included in the license for IPCC Express Standard? ()

  • A、ICM steps  
  • B、e-mail steps  
  • C、media steps 
  • D、database steps

正确答案:C

第6题:

Which of the following steps are necessary in order to add a new VLAN to a switched network?()

  • A、Create the VLAN.
  • B、Name the VLAN.
  • C、Configure an IP address for the VLAN.
  • D、Add the desired ports to the new VLAN.
  • E、Add the VLAN to the VTP domain.

正确答案:A,B,D

第7题:

Which service components develops a plan that identifies the necessary steps to move from an existing system to the Cisco Unified Communications system()

  • A、Migration Plan Development
  • B、Detailed Design Development
  • C、Staging Plan Development
  • D、Implementation Plan Development

正确答案:A

第8题:

Which of the following steps are necessary in order to add a new VLAN to a switched network?()

A. Create the VLAN.

B. Name the VLAN.

C. Configure an IP address for the VLAN.

D. Add the desired ports to the new VLAN.

E. Add the VLAN to the VTP domain.


参考答案:A, B, D

第9题:

Which two of the following steps are necessary to configure inter-VLAN routing between multilayer switches?()

  • A、Configure a dynamic routing protocol.
  • B、Configure SVI interfaces with IP addresses and subnet masks.
  • C、Configure switch ports with network addresses.
  • D、Configure switch ports with the autostate exclude command.
  • E、Document the MAC addresses of the switch ports.

正确答案:A,B

第10题:

Which of the following printers requires a specialized paper in order to operate?()

  • A、Thermal
  • B、Laser
  • C、Inkjet
  • D、Impact

正确答案:A

更多相关问题