It takes a comprehensive strategy to grow data center capabi

题目
单选题
It takes a comprehensive strategy to grow data center capabilities while containing power and cooling costs.  Which IBM thermal environment solution can best support this strategy with no effect on performance? ()
A

IBM Rear Door Heat eXchanger

B

IBM Active Energy Manager

C

IBM Calibrated Vector Cooling

D

All of the above

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

It takes forty minutes to get from the airport to the city center by taxi.


参考答案:打的从机场到市中心要花40分钟。“take time to do sht.”表“花时间做某事”。  

第2题:

Your data recovery strategy must meet the following requirements:·Back up all data files and folders in C:\Data.·Restore individual files and folders in C:\Data.·Ensure that data is backed up to and restored from external media.What should you do?()

A.A

B.B

C.C

D.D


参考答案:D

第3题:

It can be inferred from Paragraph 5 that

[A] data leakage is more severe in Europe.

[B] FTC's decision is essential to data security.

[C] California takes the lead in security legislation.

[D] legal penalty is a major Solomon to data leakage.


正确答案:D

第4题:

Which three capabilities make the Cisco Nexus 7010 switch an effective solution for the data center core? ()

  • A、 virtualization
  • B、 unified I/O
  • C、 support for 48-port Gb/s line card
  • D、 support for Data Center Service Modules
  • E、 high performance
  • F、 high availability

正确答案:B,E,F

第5题:

Which two design recommendations are most appropriate when EIGRP is the data center core routing protocol?()

A. Summarize data center subnets.

B. Use passive interfaces to ensure appropriate adjacencies.

C. Tune the EIGRP timers to enable EIGRP to achieve quicker convergence.

D. Adjust the default bandwidth value to ensure proper bandwidth on all links.

E. Advertise a default summary route into the data center core from the aggregation layer.


参考答案:A, E

第6题:

An administrator is creating a redundant environment for a current data center. A backup site must be available if the entire data center site should become unavailable. To reduce costs, this backup site does not need to be up and running at all times ready for failover. It must contain equipment and the ability to restore data from the data center.Which of the following site types should be considered to meet these requirements?()

A. Hot site

B. Warm site

C. Cold site

D. Active failover site


参考答案:B

第7题:

( ) are datasets that grow so large that they become awkward to work with on-hand database management tools.

A.Data structures B.Relations C.Big data D.Metadata


正确答案:C

第8题:

Is a programming model and an associated implementation for processing and generating big data sets with a parallel, distributed algorithm on a cluster.The model is a specialization of the split-apply-combine strategy for data analysis().

A.HDFS

B.Chukwa

C.MapReduce

D.HBase


正确答案:C

第9题:

( ) are datasets that grow SO large that they become awkward to work with on-handdatabase management tools.

A.DatA.structures
B.Relations
C.Big data
D.Metadata

答案:C
解析:
大数据是增长得非常大的数据集,以至用现有的数据库管理工具也难以奏效。

第10题:

Which two design recommendations are most appropriate when EIGRP is the data center corerouting protocol? ()

  • A、 Summarize data center subnets.
  • B、 Use passive interfaces to ensure appropriate adjacencies.
  • C、 Tune the EIGRP timers to enable EIGRP to achieve quicker convergence.
  • D、 Adjust the default bandwidth value to ensure proper bandwidth on all links.
  • E、 Advertise a default summary route into the data center core from the aggregation layer.

正确答案:A,E

更多相关问题