In CRS Administration, when you add a JTAPI Call Control Gro

题目
单选题
In CRS Administration, when you add a JTAPI Call Control Group, what is created on the Cisco CallManager?()
A

CallManager Call Control Group  

B

CRS CTI Route Point  

C

CRS JTAPI User  

D

CTI ports  

E

CRS Call Control Group  

F

CTI Route Points and directory numbers 

参考答案和解析
正确答案: D
解析: 暂无解析
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

You have just successfully added a JTAPI trigger in CRS Administration. Which two items are automatically configured on your CallManager?()

  • A、CTI dialogue control port 
  • B、CTI Route Point 
  • C、dialogue group 
  • D、Call Control Group 
  • E、CTI Route Port 
  • F、CTI Route Point association with JTAPI User

正确答案:B,F

第2题:

The Cisco CRS Server must be configured to communicate and interoperate with the Cisco CallManager. Which two must be configured on the Cisco CRS Server?()

  • A、Application Management to load applications  
  • B、JTAPI Subsystem with the JTAPI Call Control Group  
  • C、Database Subsystem communication with LDAP Directory  
  • D、JTAPI Subsystem with the JTAPI provider  

正确答案:B,D

第3题:

How does the CRS Server know that it has received an ASR-enabled contact? ()

  • A、The workflow has ASR steps in it. 
  • B、The contact is on an ASR Dialogue Group channel. 
  • C、The contact is on a JTAPI Call Control Group channel. 
  • D、The contact is on a Cisco Media Dialogue Group channel.

正确答案:B

第4题:

You use Microsoft .NET Framework 4 to create a Windows Presentation Foundation (WPF) application. You create a Button control for the application. You need to ensure that the application meets the following requirements: When the mouse pointer is over the Button control, the background color of the button is set to red and the Button control appears bigger. When the mouse pointer is not over the Button control, the button returns to its original state. What should you do?()

  • A、 Create a template. Declare a VisualState element in the template.
  • B、 Create a StoryBoard animation. Add an EventTrigger class to the Button control that begins the StoryBoard animation.
  • C、 Create a ScaleTransform class. Bind the ScaleX and ScaleY properties of the Button control to the Background property by using a custom value converter.
  • D、 Add a method named ChangeAppearance in the code-behind file. Subscribe the ChangeAppearance  method to the MouseEnter event of the Button control.

正确答案:A

第5题:

What are the components of the JTAPI Subsystem?()

  • A、provider  
  • B、CTI ports  
  • C、call control groups  
  • D、CMT Dialog Control Group  
  • E、trigger  
  • F、RM provider

正确答案:A,C,E

第6题:

How are CTI ports in a CTI Port Group added on the CRS Server?()

  • A、They must be created in Cisco Unified CallManager in ascending order (i.e., 1001, 1002, and 1003) with no gaps or missing numbers in the group.  
  • B、They can be assigned as a range of ports in CRS Application Administration.  
  • C、They are the same as the CTI Route Points in the Cisco Unified CallManager and automatically built in CRS when they are associated with the JTAPI user.  
  • D、They are the same as the CTI Route Points in the Cisco Unified CallManager and automatically built in CRS when they are associated with the RM JTAPI user.

正确答案:B

第7题:

In CRS Administration, when you add a JTAPI Call Control Group, what is created on the Cisco CallManager?()

  • A、CallManager Call Control Group  
  • B、CRS CTI Route Point  
  • C、CRS JTAPI User  
  • D、CTI ports  
  • E、CRS Call Control Group  
  • F、CTI Route Points and directory numbers 

正确答案:D

第8题:

Which of the following are automatically configured on the CallManager when entered on the CRS Application Administration?()

  • A、CTI port  
  • B、CTI Route Point  
  • C、agent skills  
  • D、JTAPI user  
  • E、CRS prompt language  
  • F、ASR provider  

正确答案:A,B,D

第9题:

You are developing a Windows Presentation Foundation (WPF) application. You need to display HTML content from a Web Page on the WPF form. What should you do?()

  • A、 Add a FlowDocumentReader control to the design surface. Then create a FlowDocument control.
  • B、 Add a ContentControl control to the design surface. The reference a WebClient object to return an HTML string.
  • C、 Add a DocumentViewer control to the design surface. The create a FixedDocument control.

正确答案:C

第10题:

When deploying IPCC Express 4.0 for the first time, when and where is the licensing of the customer specified? ()

  • A、during Installation Cluster Setup, in the CRS Installer  
  • B、after installation, during first-time login, in CRS Application Administration  
  • C、after installation, in CRS License Update Utility  
  • D、during Installation Server Setup, in the CRS Installer

正确答案:B

更多相关问题