第1题:
中国科学院
中国社会科学院
纳入企业财务管理体系的科学事业单位
各央企科研院所
第2题:
对
错
第3题:
Alt、Space
Ctrl、Space
Ctrl、Shift
Shift、Space
第4题:
①②
②③
①②③
①②④
第5题:
The concurrent application must control the web interface through application monitoring.
A second resource group will be required to move the web application and IP label to a new node during a node failure.
The concurrent resource group can support multiple IP labels through IP aliasing so all IP labels are defined in the concurrent resource group.
The dynamic node priority facility in HACMP will relocate the web application and the IP label,if it is correctly defined in the application start and stop script.
第6题:
fast convergence SFP
MTU discovery
redundancy links
keepalive
carrier delay
第7题:
消灭人类暴政,世界属于三体!
你们是虫子!
不要回答!不要回答!!不要回答!!!
你们都是虫子!
第8题:
对
错
第9题:
第10题:
reduce unnecessary disruption, delays, rework, and other problems by establishing test cases for use in verifying that the system meets operational, functional, and interface requirements
improve its ability to make sound financial decisions by developing a business case based on its business requirements and establishing a basis for developing a technology strategy
reduce operating costs and limit change-related incidents by providing a consistent and efficient set of processes
improve the return on investment and hasten migration by identifying and planning for necessary infrastructure changes and resource additions, as well as reduce deployment costs by analyzing gaps early in the planning process to determine what is needed to support the system