Company.com has two POWER5 servers. They want the two server

题目
单选题
Company.com has two POWER5 servers. They want the two servers’ virtual Ethernets to appear on the same IP subnet. Which of the following will connect the client virtual Ethernet adapters to the physical Ethernet switch connecting the two servers?()
A

Configure a Shared Ethernet Adapter on the Virtual I/O Server.

B

Use the same virtual LAN ID on each LPAR.

C

Set up IP routing through an LPAR on each system.

D

Set up an IP firewall through an LPAR on each system.

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Which feature of the IBM p5 servers enables customers to be confident that data within two distinct partitions on the server will be isolated?()

  • A、POWER Hypervisor
  • B、Virtual LAN
  • C、POWER5 processor
  • D、Redundant Power and Cooling

正确答案:A

第2题:

Company.com wants to build two Dynamic Logical Partitions (DLPAR) on a p5-520. They have a requirement for communication between the two DLPARs. Which feature of virtualization will satisfy this requirement?()

  • A、VLAN
  • B、Virtual Ethernet
  • C、Virtual I/O Server Support
  • D、Capped and Uncapped Partitions

正确答案:B

第3题:

You are the administrator of three SQL Server 2000 computers at Five Lakes Publishing. One server, FLPSQL01, stores order data. You want to be able to use the other two servers, FLPSQL02 and FLPSQL03, to answer queries and run report. The planned network configuration is shown in the exhibit.

You want to use the database Maintenance Plan wizard to configure log shipping from FLPSQL01 to FLPSQL02 and FLPSQL03. You do not want users to add any new data on FLPSQL02 and FLPSQL03, but they must be able to run queries and reports.

Which two actions should you take? (Each correct answer presents part of the solution. Choose two)

A.Set the database load state for each destination server to No recovery mode.

B.Set the database load state for each destination server to standby mode.

C.Enable the allow database to assume primary role option for both destination servers.

D.Enable the allow database to assume primary role option for one destination server and then disable this option for other destination server.

E.Disable the allow database to assume primary role option for both destination servers.


正确答案:BE
解析:Explanation:B:Astandbyservercanbemaintainedtotaketheplaceoftheprimaryproductionserver,ifneeded.AstandbyserverisasecondarySQLServerinstallationthatiskeptup-to-datewithaprimarySQLServerinstallationthroughtheapplicationoftransactionlogbackupfiles.Youcanautomatetheprocessofmaintainingastandbyserverbycreatingbackup,copy,andrestorejobsthatareperiodicallyexecutedbySQLServerAgentontheprimaryserverandonthestandbyserver.Thisautomatedprocessiscalledlogshipping.Ifyouwantthedestinationdatabasetobeviewableforread-onlyqueries,youmustselecttheStandbyModeoption,thedefaultistheNoRecoveryModeoption.TheStandbymodespecifiesthatthesecondarydatabasebemadeavailableforuse,butinread-onlymode.E:Wedon'twantuserstoaddanydataonFLPSQL02orFLPSQL03.Thereforeweshoulddisabletheallowdatabasetoassumeprimaryroleoptionforthem.IfthisoptionwereenabledFLPSQL02andFLPSQL03wouldbeabletobeusedassourceservers.IncorrectAnswers:A:Thenorecoverymodespecifiesthatthesecondarydatabasebemadeunavailableforuse.WeneedstandbymodesincewewantFLPSQL02andFLPSQL03usedforqueriesandreports.Note:TheactiveportionofthetransactionlogontheprimaryservercanbebackedupusingtheNORECOVERYbackupoption.Thisoptionleavestheprimarydatabaseinrecoverymode.Whentheprimaryserverisreadytobebroughtbackonline,thetransactionlogsfromthestandbyserver(fortheperiodthatuserswereusingthestandbyserverastheprimaryserver)canbeappliedtotheprimaryserver.Thisavoidsthenecessityofapplyingacompletedatabasebackupandallapplicabletransactionlogstorestoretheprimaryserver.Theresultisasignificantdecreaseinthetimerequiredtobringtheprimaryserverbackonline.C:Theprimaryroleoptionmustbedisabledforbothdestinationservers.Ifnottheywouldbeabletochangeandupdatedata.D:Theprimaryroleoptionmustbedisabledforbothdestinationservers.Ifnottheywouldbeabletochangeandupdatedata.

第4题:

Your network contains a Web-based application that runs on Windows Server 2003. You plan to  migrate the Web-based application to Windows Server 2008 R2. You need to recommend a server  configuration to support the Web-based application. The server configuration must meet the following  requirements:   èEnsure that the application is available to all users if a single server?fails èSupport the installation of .NET applications èMinimize software costs  What should you recommend?() 

  • A、Install the Server Core installation of Windows Server 2008 R2 Standard on two servers. Configure the servers in a Network Load Balancing cluster.
  • B、Install the full installation of Windows Server 2008 R2 Web on two servers. Configure the servers in a Network Load Balancing cluster.
  • C、Install the full installation of Windows Server 2008 R2 Enterprise on two servers. Configure the servers in a failover cluster.
  • D、Install the full installation of Windows Server 2008 R2 Datacenter on two servers. Configure the servers in a failover cluster.

正确答案:B

第5题:

Company.com has two POWER5 servers. They want the two servers’ virtual Ethernets to appear on the same IP subnet. Which of the following will connect the client virtual Ethernet adapters to the physical Ethernet switch connecting the two servers?()

  • A、Configure a Shared Ethernet Adapter on the Virtual I/O Server.
  • B、Use the same virtual LAN ID on each LPAR.
  • C、Set up IP routing through an LPAR on each system.
  • D、Set up an IP firewall through an LPAR on each system.

正确答案:A

第6题:

A small organization is purchasing a POWER5 to consolidate four applications. Currently, each application has two Host Bus Adapters (HBA) connected to an Enterprise Storage Server (ESS). The customer is concerned about the cost of purchasing eight new HBAs. Which feature of virtualization will be most beneficial to this organization?()

  • A、Virtual Ethernet
  • B、Micro-Partitioning
  • C、Virtual I/O Server
  • D、Capped and uncapped partitions

正确答案:C

第7题:

A customer has just purchased six x346 servers running Windows 2003 Web Edition.They are expecting to add six additional x346’s in three months.They have a requirement to automatically deploy the current server image upon the new servers. What TWO actions are required to complete this task?()

  • A、Ensure Director Agent is installed on the new servers.
  • B、Ensure a DHCP Sever is installed and configured in the environment.
  • C、Ensure Server Plus Pack option has been installed and configured.
  • D、Ensure Software Distribution has been installed on the IBM Director Server and an image has been created.
  • E、Ensure Remote Deployment Manager has been installed on the IBM Director Server and an image has been created.

正确答案:B,E

第8题:

Your company has two data centers.  Each data center contains a perimeter network.  Your network contains an Exchange Server 2010 organization.  You plan to deploy Exchange Server 2010 Edge Transport servers in the perimeter networks.  You need to recommend a solution for the Edge Transport servers that meets the following requirements:.Distribute inbound e-mail messages across all Edge Transport servers  .Ensure that users receive inbound e-mail messages if an Edge Transport server fails  .Ensure that users receive inbound e-mail messages if a single data center network becomes unavailable .Minimize costs  What should you recommend?()

  • A、In each perimeter network, deploy one Edge Transport server. Implement failover clustering.
  • B、In each perimeter network, deploy two Edge Transport servers. Implement failover clustering.
  • C、In each perimeter network, deploy one Edge Transport server. Configure a mail exchange (MX) record for each server.
  • D、In each perimeter network, deploy two Edge Transport servers. Configure a mail exchange (MX) record for each server.

正确答案:C

第9题:

Which of the following best describes Simultaneous Multi-threading (SMT)?()

  • A、A POWER5 microprocessor feature that allocates two processors to each application
  • B、A Workload Manager feature that allows two processing threads to be executing on a single processor
  • C、An AIX v5.2 feature that allows two processing threads to be executing on a single processor concurrently
  • D、A POWER5 microprocessor feature that allows two processing threads to be executing on a single processor concurrently

正确答案:D

第10题:

You are employed as the enterprise exchange administrator at TestKing.com. The TestKing.com networkconsits of a single Active Directory site. TestKing.com makes use of Microsoft Exchange Servermessaging solution. You are in the process of planning the deployment of Exchange Server 2010. The CIO provides you withthe set criteria needed to deploy the Exchange Server 2010 servers. TestKing.com wants you to ensurethat: * The Mailbox servers belong to the database availability group (DAG). * The users are able to send and receive e-mail in the event of a single server failure. * The minimization of the amount of servers deployed. * The load balancing of MAPI connections form Outlook Clients using hardware load balancer.You need to plan the deployment to the Exchange Server 2010 servers to meet the above criteria. What should you do?()

  • A、Your plan should include deploying four servers.The Mailbox server role as well as the Hub Transport server role should be configured on two serversand the Client Access server role on the remaining two.Therafter a Client Access server array should be configured.
  • B、Your plan should include deploying two servers.The Mailbox server role, the Client Access server role as well as the Hub Transport server role shouldbe configured on the two servers there after a Client Access server array should be configured.
  • C、Your plan should include deploying four servers.The Mailbox server role should be deployed on two servers and the Client Access server role and theHub Transport server role on the remaining two.Therafter Outlook Anywhere should be enabled on both Client  Accessservers.
  • D、Your plan should include deploying two servers.The Mailbox serve role, the Client Access server role as well as the Hub Transport server role shouldbe deployed on the two servers.Thereafter Outlook Anywhere should be enabled on both Client Access Servers.

正确答案:B