第1题:
A.它的完整写法是Damageinc ident
B.它指的是财产损失事件
C.DAM事件中肯定也伴随其他伤害事故的发生
D.DAM事件属于负面HSSE指标
第2题:
There was no use ____ a dam where there was no water.
A: to build
B: build
C: to building
D: building
第3题:
A.自然、艳丽
B.艳丽、自然
C.柔和、自然
第4题:
土石坝(earth-rock dam)
第5题:
自然堤
第6题:
(e) Internal controls are very important in a complex civil engineering project such as the Giant Dam Project.
Required:
Describe the difficulties of maintaining sound internal controls in the Giant Dam Project created by working
through sub-contractors. (4 marks)
第7题:
Normal pool elevation is the height in feet of the section of river above a dam. This height is measured from ______.
A.low steel on the Huey P. Long Bridge
B.mean sea level
C.the local water table
D.the minimum dam control level
第8题:
此题为判断题(对,错)。
第9题:
重力坝(gravity dam)
第10题:
拱坝(arch dam)