The()is the intermediate deck between upper deck and the ins

题目
单选题
The()is the intermediate deck between upper deck and the inside bottom of the vessel.
A

forcastle

B

tweendeck

C

hatches

D

peak tanks

参考答案和解析
正确答案: D
解析: 暂无解析
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Strongbacks unshipped in an intermediate deck shall not be placed closer than 15.24 cm from ______.

A.the coaming

B.hatch way

C.fore bulkhead

D.aft bulkhead


正确答案:A

第2题:

______:the vertical distance measured on the vessel’s side amidships from the load water line to the upper side of the freeboard deck or a point corresponding to it.

A.Buoyancy

B.Freeboard

C.Draft

D.Displacement


正确答案:B
船中部从载重水线垂直测量到干舷甲板上边缘或相应的点的距离叫干舷。

第3题:

Regulations define the bulkhead deck as ______.(subdivision and stability regulations)

A.any deck extending from stem to stern

B.the uppermost deck to which transverse watertight bulkheads extend

C.the lowermost deck to which transverse watertight bulkheads extend

D.the uppermost complete deck


正确答案:B

第4题:

主甲板以下是二层甲板。()

  • A、The deck below the lower deck is known as ‘tween deck.
  • B、The deck below the main deck is known as ‘tween deck.
  • C、The deck above the main deck is known as ‘tween deck.
  • D、The deck below the lower deck is known as main deck.

正确答案:B

第5题:

Cribbing is ______.

A.wooden blocks or dunnage placed between a deck load and the deck

B.the chains and shackles used to secure a deck cargo

C.a crate in which a deck cargo is packaged

D.cardboard separation pieces placed between deck loads to prevent chafing


正确答案:A
撑垫材是放置在甲板货和甲板之间的木制的墩木或铺垫板。

第6题:

Which statement about the deck line is TRUE ________.

A.The top of the deck line is marked at the highest point of the freeboard deck,including camber,at the midships point

B.A vessel with wooden planks on a steel deck will have the deck line marked at the intersection of the upper line of the wood sheathing with the side shell

C.The deck edge is marked at the intersection of the freeboard deck with the side shell,at the lowest point of sheer,with the vessel at even trim

D.On a vessel with a rounded stringer-sheer plate,the deck line is marked where the stringer plate turns down from the plane of the deck line


正确答案:B

第7题:

Between the side frames on a vessel, suppot for the deck beam is provided by ______.

A.brackets

B.web frames

C.deck stringers

D.stanchions


正确答案:D
在船舶的肋骨之间,为甲板横梁提供支撑的是支柱。

第8题:

Strongbacks unshipped in an intermediate deck shall be secured so that they cannot be ______ into a lower compartment.

A.moved

B.tipped or dragged

C.removed

D.put


正确答案:B

第9题:

空运的集运商要会填()。

  • A、HAWB
  • B、MAWB
  • C、Main Deck
  • D、Upper Deck

正确答案:B

第10题:

The deck from bow to stern is called the ()(主甲板).

  • A、main deck
  • B、tweendeck
  • C、upper deck
  • D、lower deck

正确答案:A

更多相关问题