starters
pressure switches
pressure
water
第1题:
Prior to getting underway in fresh or brackish water,the Master must ______.
A.log the density of the water
B.secure all overboard discharges
C.take on fresh water ballast
D.clean the sides with fresh water
第2题:
水泥涂料用于淡水舱和双层底舱。()
第3题:
Will we connect the motor with the fresh water pump? No, the pump is ( )_
A.in good order
B.out of order
C.works well
第4题:
the oil separator
the fresh water generator
the compressor
fire pump
第5题:
污水井盖()
第6题:
______is the number of millimeters by which the mean draft changes when a ship passes from salt water to fresh water,or vice versa,whilst floating at the loaded draft.
A.TPC
B.The Fresh Water Allowance
C.Parallel sinking of the ship
D.UKC
第7题:
Cooling water pump
第8题:
The amount of fuel delivered by a helical plunger fuel injection pump is controlled by ______.
A.varying the pump discharge pressure
B.varying the pump return pressure
C.rotation of the pump plunger
D.rotation of the pump barrel
第9题:
main switchboard
engine room bilge
breathing compartment
electric fresh water transfer pump
第10题:
the motor
the fresh water generator
the governor
the fuel pump