In the voyage, when carrying out abandon ship drill () shoul

题目
单选题
In the voyage, when carrying out abandon ship drill () should be test every time.
A

the emergency lighting system for muster and abandon ship

B

air oil emergency shut-down

C

ME emergency operation

D

main auxiliary steering gear changing

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

If passengers are on board when an abandon ship drill is carried out,they should ______.

A.take part

B.watch

C.go to their quarters

D.stay out of the way and do what they want


正确答案:A

第2题:

Topside paint is applied to the area of the ship’s ()which is out of water when the ship is loaded.

  • A、hull
  • B、cabin
  • C、cargo hold
  • D、deck

正确答案:A

第3题:

______, where the ship is docked for hull coating renewal, and for any other required underwater work to be carried out, when the opportunity is taken to make other repairs.

A.Voyage repairs

B.Routine docking

C.Damage repairs

D.Conversion


正确答案:B

第4题:

单选题
In the voyage, when carrying out abandon ship drill, should be test every time().
A

the emergency lighting system for muster and abandon ship

B

air/oil emergency shut-down

C

M-Eemergency operation

D

main/auxiliary steering gear changing


正确答案: A
解析: 暂无解析

第5题:

When the charterer uses more time than time stipulated in a voyage C/P to load his cargo, the ship-owner is entitled to()

  • A、overtime
  • B、dispatch
  • C、demurrage
  • D、deadfreight

正确答案:C

第6题:

Fire drill is ()(执行)once a month.

  • A、carry out
  • B、carried out
  • C、carrying out
  • D、carry on

正确答案:B

第7题:

We are going to carry out an/a ()(应急演习).

  • A、fire drill
  • B、emergency drill
  • C、boat drill
  • D、abandon ship drill

正确答案:B

第8题:

The term of Landfall means ________ .

A.Land first sighted when vessel approaching from seaward

B.Land last sighted when vessel leaving from a port

C.in sight of one another when vessel underway

D.in sight of an island during a ship on her voyage


正确答案:A

第9题:

单选题
The tallying of cargo refers to such kind of work that the amount and condition of all cargo should be checked().
A

after its arrival at the destination

B

during the ship's voyage at sea

C

before they come to the dock

D

during the time when the loading or diacharging is going on


正确答案: C
解析: 暂无解析

第10题:

单选题
The main function of the drawworks on a ship is to().
A

transport tubulars from the pipe racks to the derrick floor

B

maintain constant tension on the marine riser

C

store and secure the excess drill line

D

lower and hoist the drill string into and out of the drilled hole


正确答案: B
解析: 暂无解析

更多相关问题