chief engineer
surveyor
the engineer
the technique personnel of the shipyard
第1题:
A.Overhaul repair is a major repair.
B.Overhaul repair is carried out in a dock.
C.Overhaul repair is carried out once a year.
D.Overhaul repair is done for the purpose of rating.
第2题:
You should log all barometer readings taken at sea ______.
A.regularly
B.at least once during each watch
C.more often under changeable weather conditions
D.All of the above
第3题:
Although a ship usually has repair in a shipyard, ________ is also necessary
A.the general repair on board
B.the voyage repair
C.the annual repair
D.the dock repair
第4题:
taken away
engaged
connected
sealed off
第5题:
cargo pump failure
blower failure
deck seal low water level
low inert gas temperature
第6题:
During the dock repair,______should be measured firstly before tail shaft drawn out.
A.the sinking of tail shaft
B.the clearance of stern bearing
C.the total flexure of shaft
D.main engine crankshaft deflection
第7题:
Which statement concerning GMDSS Radio Operator requirements is FALSE ________.
A.Each compulsory vessel must carry at least two licensed GMDSS Radio Operators at all times while at sea
B.Each compulsory vessel must carry at least two licensed Radio Operators at all times while at sea and may elect to carry a GMDSS Radio Maintainer as well
C.Communications involving safety of life at sea do not have to be logged as long as the compulsory vessel was not involved in such communications
D.While at sea,adjustments to,and the maintaining of,GMDSS equipment may be performed by the GMDSS Radio operator as long as the work is supervised by an onboard licensed GMDSS Radio Maintainer
第8题:
A、by sea, at sea
B、by the sea, at the sea
C、by the sea, at sea
D、by sea, at the sea
第9题:
the same, whether at sea, or during maneuvering
adjusted during each hour of operation while at constant RPM
higher at sea than while maneuvering
lower at sea than while maneuvering
第10题:
Open the intake valve to an adjacent tank
Set out drip pans and sawdust and begin to mop up the spill
Signal the shore control point to shut down
Close the valve on the tank vent line